{"title":"A CONTRACT REVIEWED FROM THE PERSPECTIVE OF CIVIL LAW IN INDONESIA MAY BE DELAYED DUE TO FORCE MAJEURE","authors":"Ri˚zki Kurniawan, Zakiah Noer","doi":"10.52249/ilr.v4i1.223","DOIUrl":null,"url":null,"abstract":"The aim of this study is to: Recognize the structure of an emergency clause (force majeure) in a contract; and Recognize the legal implications for the parties involved and the actions that need to be taken in the event that an emergency (force majeure) nullifies a contract. In this study, the author used three distinct methodologies, conceptual, legislative, and comparative. However, in order to fulfill their responsibilities under a contract or agreement, the parties must be able to prove that they are faced with legitimate obstacles","PeriodicalId":500708,"journal":{"name":"IBLAM Law Review","volume":"39 8","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IBLAM Law Review","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.52249/ilr.v4i1.223","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The aim of this study is to: Recognize the structure of an emergency clause (force majeure) in a contract; and Recognize the legal implications for the parties involved and the actions that need to be taken in the event that an emergency (force majeure) nullifies a contract. In this study, the author used three distinct methodologies, conceptual, legislative, and comparative. However, in order to fulfill their responsibilities under a contract or agreement, the parties must be able to prove that they are faced with legitimate obstacles