{"title":"On the Key Points of Technical Management in High rise Building Engineering","authors":"Jie Jin","doi":"10.54691/gy2car84","DOIUrl":null,"url":null,"abstract":"For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.","PeriodicalId":476071,"journal":{"name":"Frontiers in Humanities and Social Sciences","volume":"22 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers in Humanities and Social Sciences","FirstCategoryId":"0","ListUrlMain":"https://doi.org/10.54691/gy2car84","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
For the technical management of high-rise building construction projects, it involves a systematic approach throughout the entire construction process. The pre construction stage requires careful planning, from site selection to market analysis, while engineering design ensures structural integrity and functional efficiency. Efficient project organization, procurement, and on-site management, as well as strict quality control, are crucial during the construction phase. The focus of the post construction phase is debugging, seamless handover, and continuous facility operation and maintenance. Overall, by adopting comprehensive technical management, the safe and efficient construction of high-rise buildings has been ensured, meeting functional and aesthetic requirements while considering environmental protection.