Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka

IF 3.5 Q3 GREEN & SUSTAINABLE SCIENCE & TECHNOLOGY Smart and Sustainable Built Environment Pub Date : 2024-04-03 DOI:10.1108/sasbe-07-2023-0179
Deraniyagalage Chanaka Karunarathna, H. Perera, B.A.K.S. Perera, P.A.P.V.D.S. Disaratna
{"title":"Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka","authors":"Deraniyagalage Chanaka Karunarathna, H. Perera, B.A.K.S. Perera, P.A.P.V.D.S. Disaratna","doi":"10.1108/sasbe-07-2023-0179","DOIUrl":null,"url":null,"abstract":"PurposeDelays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.Design/methodology/approachThe study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.FindingsThe findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.Originality/valueThis study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.","PeriodicalId":45779,"journal":{"name":"Smart and Sustainable Built Environment","volume":null,"pages":null},"PeriodicalIF":3.5000,"publicationDate":"2024-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smart and Sustainable Built Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/sasbe-07-2023-0179","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GREEN & SUSTAINABLE SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeDelays in utility shifting during road construction have broad ramifications. These delays not only lengthen the project's timeline but also raise expenses and cause problems with resource allocation. Thus, this study investigates the influence of delay in utility shifting for extension of time claims in road construction projects (RCPs) in Sri Lanka.Design/methodology/approachThe study used a quantitative approach with three rounds of Delphi surveys to gather empirical data. Further, the probability impact assessment was used to carefully analyse the data and appraise the information gathered.FindingsThe findings initially revealed 33 causes of delays in utility shifting for extension of time claims in RCPs in Sri Lanka. Ultimately, 11 severe causes were identified based on their high probability and impact, concluding with 45 strategies that were assigned to overcoming those most severe causes of delay.Originality/valueThis study will contribute to the industry and theory by providing solutions to handle utility-shifting delays with the linkage of preventing time extension claims for RCPs in Sri Lanka. Further, there is a dearth of literature in the research area, both locally and globally. Thus, the findings of this research will provide a benchmark for further detailed studies in other countries as well.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
斯里兰卡公路建设项目中公用设施移位延迟对延期索赔的影响
目的道路施工期间的公用设施移位延迟会产生广泛的影响。这些延误不仅会延长项目的工期,还会增加开支,造成资源分配问题。因此,本研究调查了公用设施移位延迟对斯里兰卡道路建设项目(RCP)延期索赔的影响。 设计/方法/途径本研究采用定量方法,通过三轮德尔菲调查收集经验数据。此外,还采用了概率影响评估方法来仔细分析数据和评估收集到的信息。研究结果研究结果初步显示,在斯里兰卡的道路施工项目中,有 33 个原因造成了公用设施移位延期索赔的延误。最终,根据其高概率和影响,确定了 11 个严重原因,并为克服这些最严重的延误原因制定了 45 项策略。原创性/价值本研究将为行业和理论做出贡献,提供处理水电移位延误的解决方案,并与防止斯里兰卡垃圾收集站延期索赔挂钩。此外,无论是在本地还是在全球范围内,该研究领域的文献都十分匮乏。因此,本研究的结果将为在其他国家开展进一步的详细研究提供基准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Smart and Sustainable Built Environment
Smart and Sustainable Built Environment GREEN & SUSTAINABLE SCIENCE & TECHNOLOGY-
CiteScore
9.20
自引率
8.30%
发文量
53
期刊最新文献
Towards promoting circular building adaptability in adaptive reuse projects: a co-developed framework Sources of occupational stress in UK construction projects: an empirical investigation and agenda for future research Nudge or mandate: an exploration into the constraints of volumetric modular construction in Australia Structural determinants of the uptake of cyber-physical systems for facilities management – a confirmatory factor analysis approach Public toilets for accessible and inclusive cities: disability, design and maintenance from the perspective of wheelchair users
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1