The CDO: An innovative, flexible and modern Operations Control Centre for Europe's spaceport, French Guiana : Ground system architecture, resilience & operational excellence

IF 1 Q3 ENGINEERING, AEROSPACE Journal of Space Safety Engineering Pub Date : 2024-06-01 DOI:10.1016/j.jsse.2024.04.006
Sandra Steere , Eric Julien , Frédéric Manon
{"title":"The CDO: An innovative, flexible and modern Operations Control Centre for Europe's spaceport, French Guiana : Ground system architecture, resilience & operational excellence","authors":"Sandra Steere ,&nbsp;Eric Julien ,&nbsp;Frédéric Manon","doi":"10.1016/j.jsse.2024.04.006","DOIUrl":null,"url":null,"abstract":"<div><p>The CSG, Europe's Spaceport in French Guiana was granted major financing from ESA and CNES at the ESA's Council Ministerial in 2019 in order to implement crucial largescale renovations and modernization of the launch base. With the arrival of ARIANE-6 &amp; VEGA but also new launchers such as CALLISTO &amp; SPACERIDER, the core launch range must be renewed to be capable of offering game-changing flexible and attractive services. The program is called the \"Core Launch Range Renewal\" (CLRR).</p><p>The CLRR has 6 components, including the new Launcher Tracking &amp; Flight Safety Operations Control Centre (known as the CDO). The CDO will group all of the CNES operators involved in the ground operations, within a dedicated state of the art 3 story building, including 7 operations centres and two dedicated data centers. The ground segment system has been completely redesigned, allowing flexibility within operations, by introducing automation of configuration and validation operator tasks.</p><p>The CDO-BLA (ground software segment) aims to improve human factors aspects for the flight tracking operators at the European Spaceport. The CDO-BLA brings with it a state of the art ground system architecture and an innovative Simulator called STONES (Simulator Training Operational Numerical Environment System).</p><p>The ground system architecture of the CDO-BLA introduces technical solutions providing high-scale flexibility for campaign operations &amp; intrinsic resilience of the ground segment. The simulator digitally emulates complex external equipment such as the launcher, radars &amp; telemetry antennas, providing operators with a life-like launch environment. For each campaign, operators will be able to perform training but more importantly qualify the CDO configuration ready for a launch, carry out maintenance all of which in parallel to different operations, without having to connect to external interfaces. The aim is to be able to reconfigure le CDO, between 2 launches, within 2 working days whilst aiming for operational excellence!</p></div>","PeriodicalId":37283,"journal":{"name":"Journal of Space Safety Engineering","volume":"11 2","pages":"Pages 301-310"},"PeriodicalIF":1.0000,"publicationDate":"2024-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Space Safety Engineering","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2468896724000521","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, AEROSPACE","Score":null,"Total":0}
引用次数: 0

Abstract

The CSG, Europe's Spaceport in French Guiana was granted major financing from ESA and CNES at the ESA's Council Ministerial in 2019 in order to implement crucial largescale renovations and modernization of the launch base. With the arrival of ARIANE-6 & VEGA but also new launchers such as CALLISTO & SPACERIDER, the core launch range must be renewed to be capable of offering game-changing flexible and attractive services. The program is called the "Core Launch Range Renewal" (CLRR).

The CLRR has 6 components, including the new Launcher Tracking & Flight Safety Operations Control Centre (known as the CDO). The CDO will group all of the CNES operators involved in the ground operations, within a dedicated state of the art 3 story building, including 7 operations centres and two dedicated data centers. The ground segment system has been completely redesigned, allowing flexibility within operations, by introducing automation of configuration and validation operator tasks.

The CDO-BLA (ground software segment) aims to improve human factors aspects for the flight tracking operators at the European Spaceport. The CDO-BLA brings with it a state of the art ground system architecture and an innovative Simulator called STONES (Simulator Training Operational Numerical Environment System).

The ground system architecture of the CDO-BLA introduces technical solutions providing high-scale flexibility for campaign operations & intrinsic resilience of the ground segment. The simulator digitally emulates complex external equipment such as the launcher, radars & telemetry antennas, providing operators with a life-like launch environment. For each campaign, operators will be able to perform training but more importantly qualify the CDO configuration ready for a launch, carry out maintenance all of which in parallel to different operations, without having to connect to external interfaces. The aim is to be able to reconfigure le CDO, between 2 launches, within 2 working days whilst aiming for operational excellence!

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
CDO:法属圭亚那欧洲航天发射场创新、灵活、现代化的运行控制中心:地面系统架构、弹性和卓越运行
位于法属圭亚那的欧洲航天发射场(CSG)在2019年欧空局部长理事会上获得了欧空局和法国国家空间研究中心(CNES)的大笔资助,用于对发射基地进行关键的大规模翻新和现代化改造。随着阿丽亚娜6号(ARIANE-6 & VEGA)以及CALLISTO & SPACERIDER等新型发射装置的到来,核心发射范围必须更新,以便能够提供改变游戏规则的灵活而有吸引力的服务。该计划被称为 "核心发射场更新"(CLRR)。CLRR 有 6 个组成部分,包括新的发射器跟踪与飞行安全运行控制中心(称为 CDO)。CDO 将把法国国家空间研究中心(CNES)所有参与地面运行的操作人员集中在一栋 3 层楼高的先进建筑中,包括 7 个操作中心和 2 个专用数据中心。CDO-BLA(地面软件部分)旨在改善欧洲航天发射场飞行跟踪操作人员的人为因素。CDO-BLA 的地面系统结构引入了技术解决方案,为活动操作和amp 提供了大规模的灵活性;地面部分具有内在的弹性。模拟器以数字方式模拟发射装置、雷达和遥测天线等复杂的外部设备,为操作员提供逼真的发射环境。在每次活动中,操作员都可以进行培训,但更重要的是,他们可以对 CDO 的配置进行鉴定,为发射做好准备,还可以进行维护,所有这些都与不同的操作并行进行,而无需连接到外部接口。我们的目标是在 2 个工作日内,在 2 次发射之间重新配置 CDO,同时实现卓越运行!
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Space Safety Engineering
Journal of Space Safety Engineering Engineering-Safety, Risk, Reliability and Quality
CiteScore
2.50
自引率
0.00%
发文量
80
期刊最新文献
Editorial Board An economic indicator of the orbital debris environment Adaptive relative orbit control considering laser ablation uncertainty Post mission disposal of Megha-Tropiques-1 through controlled atmospheric Re-entry to be published in: The journal of space safety engineering Development of ballistic limit equations in support of the Mars sample return mission
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1