Adaptability of BIM technology to mitigate the cost overruns in design and build projects

K.L. Chamikara, B.A.K.S. Perera, Dinithi Piyumra Raigama Acharige, Biyanka Ekanayake
{"title":"Adaptability of BIM technology to mitigate the cost overruns in design and build projects","authors":"K.L. Chamikara, B.A.K.S. Perera, Dinithi Piyumra Raigama Acharige, Biyanka Ekanayake","doi":"10.1108/ci-01-2024-0018","DOIUrl":null,"url":null,"abstract":"\nPurpose\nCost overruns are an inevitable issue in design and build (D&B) projects. In D&B projects, causes for cost overruns can be managed by adopting appropriate building information modelling (BIM) functions. Because there is a research gap in synergy between the use of BIM for mitigating cost overruns in D&B projects, this study aims to evaluate the adaptability of BIM to manage cost overrun issues in them.\n\n\nDesign/methodology/approach\nResearch objectives were attained through a quantitative research approach adopting the Delphi technique, which consists of three rounds of a questionnaire survey. Through statistical tools, the collected data were analysed.\n\n\nFindings\nThis research revealed the ten most crucial causes for cost overruns in D&B projects, where continuous changes in designs and drawings are the top causes. Change and revision management and interoperability are the most crucial BIM functions to address the aforementioned cause. Subsequently, 16 enablers, 26 barriers and 19 strategies to implement BIM to manage the identified significant causes of cost overruns were overviewed.\n\n\nOriginality/value\nThis study addresses the literature gap pertaining to the cost overrun in D&B projects and the application of BIM by studying the causes for cost overrun, suggesting BIM functions to mitigate the above cause. Moreover, this study assessed the probable barriers and enablers for BIM adoption in construction projects from D&B perspective.\n","PeriodicalId":504034,"journal":{"name":"Construction Innovation","volume":"39 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-01-2024-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose Cost overruns are an inevitable issue in design and build (D&B) projects. In D&B projects, causes for cost overruns can be managed by adopting appropriate building information modelling (BIM) functions. Because there is a research gap in synergy between the use of BIM for mitigating cost overruns in D&B projects, this study aims to evaluate the adaptability of BIM to manage cost overrun issues in them. Design/methodology/approach Research objectives were attained through a quantitative research approach adopting the Delphi technique, which consists of three rounds of a questionnaire survey. Through statistical tools, the collected data were analysed. Findings This research revealed the ten most crucial causes for cost overruns in D&B projects, where continuous changes in designs and drawings are the top causes. Change and revision management and interoperability are the most crucial BIM functions to address the aforementioned cause. Subsequently, 16 enablers, 26 barriers and 19 strategies to implement BIM to manage the identified significant causes of cost overruns were overviewed. Originality/value This study addresses the literature gap pertaining to the cost overrun in D&B projects and the application of BIM by studying the causes for cost overrun, suggesting BIM functions to mitigate the above cause. Moreover, this study assessed the probable barriers and enablers for BIM adoption in construction projects from D&B perspective.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
BIM 技术在减少设计和施工项目成本超支方面的适应性
目的 成本超支是设计和建造(D&B)项目中不可避免的问题。在设计和建造项目中,成本超支的原因可以通过采用适当的建筑信息模型(BIM)功能来管理。由于在 D&B 项目中使用 BIM 减少成本超支的协同作用方面存在研究空白,本研究旨在评估 BIM 在管理 D&B 项目成本超支问题方面的适应性。通过统计工具,对收集到的数据进行了分析。研究结果这项研究揭示了设计和建造项目成本超支的十大关键原因,其中设计和图纸的不断变更是首要原因。变更和修订管理以及互操作性是解决上述原因最关键的 BIM 功能。原创性/价值 本研究通过研究成本超支的原因,提出 BIM 功能以缓解上述原因,填补了有关 D&B 项目成本超支和 BIM 应用的文献空白。此外,本研究还从邓白氏集团的角度评估了在建筑项目中采用 BIM 的可能障碍和促进因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Construction waste reduction measures for high-rise buildings in India – a stakeholder’s perspective Industry 4.0 technologies: an examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry Critical success factors (CSFs) for the implementation of distributed ledger technology (DLT) in the Nigerian construction industry Adaptability of BIM technology to mitigate the cost overruns in design and build projects The role of interpersonal conflict as a cause of work-related stress in construction managers in Ireland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1