{"title":"Switching Analysis in Hybrid OHL-Submarine Cable 500-kV Transmission System","authors":"Binhot P. Nababan;Kevin Marojahan Banjar-Nahor;Musa Partahi Marbun;Suwarno;Nanang Hariyanto","doi":"10.1109/OAJPE.2024.3425893","DOIUrl":null,"url":null,"abstract":"This study focuses on analyzing switching transients in the upcoming 500 kV Java-Bali Connection (JBC) hybrid OHL and submarine cable project using DIgSILENT PowerFactory software, based on a realistic power system model. Distributed-parameter models with constant parameters of the Bergeron model are utilized. Analysis of the traveling wave effect on the line is conducted, and the integration time step based on the time of the traveling wave is carefully selected. Statistical distributions of energization are produced by varying the circuit configuration and system short-circuit power. It is found that the Switching Withstand Voltage (SWV) during the energization process remain below 1175 kV. The probability distribution is fitted to a normal distribution, with the skewness and kurtosis shown to be skewed to the right and having a lower peak than that of the normal distribution, respectively. When a three-phase short-circuit at the line breaker is induced, the rate of rise of recovery voltage (RRRV) exceeds the IEC standard envelope if only one circuit is operating. In this contribution, switching analysis during no-load energization and de-energization in the planning stage of the mixed OHL-submarine cable is examined.","PeriodicalId":56187,"journal":{"name":"IEEE Open Access Journal of Power and Energy","volume":null,"pages":null},"PeriodicalIF":3.3000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10592028","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Open Access Journal of Power and Energy","FirstCategoryId":"1085","ListUrlMain":"https://ieeexplore.ieee.org/document/10592028/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

This study focuses on analyzing switching transients in the upcoming 500 kV Java-Bali Connection (JBC) hybrid OHL and submarine cable project using DIgSILENT PowerFactory software, based on a realistic power system model. Distributed-parameter models with constant parameters of the Bergeron model are utilized. Analysis of the traveling wave effect on the line is conducted, and the integration time step based on the time of the traveling wave is carefully selected. Statistical distributions of energization are produced by varying the circuit configuration and system short-circuit power. It is found that the Switching Withstand Voltage (SWV) during the energization process remain below 1175 kV. The probability distribution is fitted to a normal distribution, with the skewness and kurtosis shown to be skewed to the right and having a lower peak than that of the normal distribution, respectively. When a three-phase short-circuit at the line breaker is induced, the rate of rise of recovery voltage (RRRV) exceeds the IEC standard envelope if only one circuit is operating. In this contribution, switching analysis during no-load energization and de-energization in the planning stage of the mixed OHL-submarine cable is examined.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
OHL 和海底电缆 500 千伏混合输电系统中的开关分析
本研究以现实电力系统模型为基础,使用 DIgSILENT PowerFactory 软件重点分析即将开工的 500 kV Java-Bali Connection (JBC) 混合 OHL 和海底电缆项目中的开关瞬态。使用了具有 Bergeron 模型恒定参数的分布参数模型。对线路上的行波效应进行了分析,并精心选择了基于行波时间的积分时间步长。通过改变电路配置和系统短路功率,产生了通电统计分布。结果发现,通电过程中的开关耐压 (SWV) 保持在 1175 kV 以下。概率分布拟合为正态分布,其偏度和峰度分别向右倾斜,峰值低于正态分布。当线路断路器发生三相短路时,如果只有一个电路工作,则恢复电压上升率(RRRV)会超过 IEC 标准包络线。本文研究了混合 OHL 海缆规划阶段空载通电和断电时的开关分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
7.80
自引率
5.30%
发文量
45
审稿时长
10 weeks
期刊最新文献
A Novel Dual-Rotor Homopolar AC Machine Learning Power Systems Waveform Incipient Patterns Through Few-Shot Meta-Learning Data Driven Real-Time Dynamic Voltage Control Using Decentralized Execution Multi-Agent Deep Reinforcement Learning Global Research Priorities for Holistic Integration of Water and Power Systems Floating Neutral Detection Using Actual Generation of Form 2S Meters
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1