Shui Su Ravine Bridge Design and its Steel Joint Fatigue Performance Evaluation

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3085
Zhihua Xiong, Xin Yang, Xuyao Liu, Jiaqi Li
{"title":"Shui Su Ravine Bridge Design and its Steel Joint Fatigue Performance Evaluation","authors":"Zhihua Xiong,&nbsp;Xin Yang,&nbsp;Xuyao Liu,&nbsp;Jiaqi Li","doi":"10.1002/cepa.3085","DOIUrl":null,"url":null,"abstract":"<p>Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel-concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post-installation of the pre-cast concrete slab. Since the truss segment is all welded, two-step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two-dimensional model, Phase-Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3085","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Shui Su Ravine Bridge is built in Bai Shui County in Shaanxi Province, which is a part of the highway linking Heyang and Tongchuan. The bridge has been designed as a composite steel-concrete truss bridge with 3 spans in total of 240 meters and a deck of 4 lanes. To meet the harsh environmental demand and lessen the future maintenance, the solution adopts the weathering steel Q420qENH similar strength as S420NL in European code. The bridge is erected by incremental launching and post-installation of the pre-cast concrete slab. Since the truss segment is all welded, two-step models have been developed to evaluate the fatigue performance of the steel truss joint. In the simplified two-dimensional model, Phase-Field (PF) approach has been implemented to make a full fatigue evaluation of crack propagation in the truss.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
水苏涧大桥设计及其钢接缝疲劳性能评估
水苏涧大桥位于陕西省白水县,是连接合阳和铜川的高速公路的一部分。该桥设计为钢-混凝土组合桁架桥,共 3 跨 240 米,桥面为 4 车道。为满足苛刻的环境要求并减少日后的维护,该方案采用了与欧洲规范中 S420NL 强度相近的耐候钢 Q420qENH。桥梁的架设采用增量式下水和预制混凝土板后安装的方式。由于桁架部分全部采用焊接,因此开发了两步模型来评估钢桁架连接处的疲劳性能。在简化的二维模型中,采用了相场(PF)方法对桁架中的裂纹扩展进行全面的疲劳评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Issue Information Reliability-based Allowances of Corrosion Losses for Weathering Steel Bridges Failure mode and load prediction of steel bridge girders through 3D laser scanning and machine learning methods ‘Robinson’ Pedestrian Bridge in Budapest, Hungary Cable-stayed footbridge in Lover Vítkovice Area-DOV
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1