“Modernization of Railway Track Pardubice –Stéblová: New steel bridge over Labe river”

ce/papers Pub Date : 2024-09-11 DOI:10.1002/cepa.3060
Ing. Jan Mitlöhner
{"title":"“Modernization of Railway Track Pardubice –Stéblová: New steel bridge over Labe river”","authors":"Ing. Jan Mitlöhner","doi":"10.1002/cepa.3060","DOIUrl":null,"url":null,"abstract":"<p>The construction of a new double-track steel railway arch bridge over the Elbe river, which replaced the original single-track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140-meter-long, three-span bridge was realized as part of the modernization and double-tracking of the Pardubice - Hradec Králové line between 2021-2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat</p>","PeriodicalId":100223,"journal":{"name":"ce/papers","volume":"7 3-4","pages":"33-37"},"PeriodicalIF":0.0000,"publicationDate":"2024-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ce/papers","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cepa.3060","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of a new double-track steel railway arch bridge over the Elbe river, which replaced the original single-track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140-meter-long, three-span bridge was realized as part of the modernization and double-tracking of the Pardubice - Hradec Králové line between 2021-2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
"帕尔杜比采 - 斯特布洛娃铁路现代化:拉贝河上的新钢桥"
易北河上新建的双轨钢拱铁路桥取代了 1966 年的单轨桥,大大提高了帕尔杜比采的铁路运输能力、速度和平稳性。这座 140 米长的三跨桥是 2021-2024 年间帕尔杜比采至赫拉德茨-克拉洛韦线路现代化和双轨化工程的一部分。它的建造,加上原桥的临时使用,是一项了不起的工程壮举
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Issue Information Reliability-based Allowances of Corrosion Losses for Weathering Steel Bridges Failure mode and load prediction of steel bridge girders through 3D laser scanning and machine learning methods ‘Robinson’ Pedestrian Bridge in Budapest, Hungary Cable-stayed footbridge in Lover Vítkovice Area-DOV
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1