Ground response and failure mechanism of gob-side entry by roof cutting with hard main roof

IF 3.7 2区 材料科学 Q1 METALLURGY & METALLURGICAL ENGINEERING Journal of Central South University Pub Date : 2024-08-13 DOI:10.1007/s11771-024-5695-3
Heng-zhong Zhu, Lei Xu, Zhi-jie Wen
{"title":"Ground response and failure mechanism of gob-side entry by roof cutting with hard main roof","authors":"Heng-zhong Zhu, Lei Xu, Zhi-jie Wen","doi":"10.1007/s11771-024-5695-3","DOIUrl":null,"url":null,"abstract":"<p>This study is the result of long-term efforts of the authors’ team to assess ground response of gob-side entry by roof cutting (GSERC) with hard main roof, aiming at scientific control for GSERC deformation. A comprehensive field measurement program was conducted to determine entry deformation, roof fracture zone, and anchor bolt (cable) loading. The results indicate that GSERC deformation presents asymmetric characteristics. The maximum convergence near roof cutting side is 458 mm during the primary use process and 1120 mm during the secondary reuse process. The entry deformation is closely associated with the primary development stage, primary use stage, and secondary reuse stage. The key block movement of roof cutting structure, a complex stress environment, and a mismatch in the supporting design scheme are the failure mechanism of GSERC. A controlling ideology for mining states, including regional and stage divisions, was proposed. Both dynamic and permanent support schemes have been implemented in the field. Engineering practice results indicate that the new support scheme can efficiently ensure long-term entry safety and could be a reliable approach for other engineering practices.</p>","PeriodicalId":15231,"journal":{"name":"Journal of Central South University","volume":null,"pages":null},"PeriodicalIF":3.7000,"publicationDate":"2024-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Central South University","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.1007/s11771-024-5695-3","RegionNum":2,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"METALLURGY & METALLURGICAL ENGINEERING","Score":null,"Total":0}
引用次数: 0

Abstract

This study is the result of long-term efforts of the authors’ team to assess ground response of gob-side entry by roof cutting (GSERC) with hard main roof, aiming at scientific control for GSERC deformation. A comprehensive field measurement program was conducted to determine entry deformation, roof fracture zone, and anchor bolt (cable) loading. The results indicate that GSERC deformation presents asymmetric characteristics. The maximum convergence near roof cutting side is 458 mm during the primary use process and 1120 mm during the secondary reuse process. The entry deformation is closely associated with the primary development stage, primary use stage, and secondary reuse stage. The key block movement of roof cutting structure, a complex stress environment, and a mismatch in the supporting design scheme are the failure mechanism of GSERC. A controlling ideology for mining states, including regional and stage divisions, was proposed. Both dynamic and permanent support schemes have been implemented in the field. Engineering practice results indicate that the new support scheme can efficiently ensure long-term entry safety and could be a reliable approach for other engineering practices.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
硬质主顶板切割鹅卵石侧进的地面响应和破坏机理
本研究是作者团队长期努力的成果,旨在评估硬质主顶板鹅卵石侧进入顶板(GSERC)的地面响应,对 GSERC 变形进行科学控制。我们开展了一项全面的实地测量计划,以确定入口变形、顶板断裂带和锚栓(缆索)荷载。结果表明,金沙江河谷地下水自动监测中心的变形呈现非对称特征。在一次使用过程中,靠近屋顶切割侧的最大汇聚量为 458 毫米,而在二次再使用过程中为 1120 毫米。入口变形与一级开发阶段、一级使用阶段和二级重复使用阶段密切相关。顶板切割结构的关键块体移动、复杂的应力环境以及支护设计方案的不匹配是 GSERC 的失效机理。提出了采矿状态的控制思想,包括区域和阶段划分。动态和永久支护方案均已在现场实施。工程实践结果表明,新的支护方案可有效确保长期进场安全,并可作为其他工程实践的可靠方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Central South University
Journal of Central South University METALLURGY & METALLURGICAL ENGINEERING-
CiteScore
6.10
自引率
6.80%
发文量
242
审稿时长
2-4 weeks
期刊介绍: Focuses on the latest research achievements in mining and metallurgy Coverage spans across materials science and engineering, metallurgical science and engineering, mineral processing, geology and mining, chemical engineering, and mechanical, electronic and information engineering
期刊最新文献
Multi-dimension and multi-modal rolling mill vibration prediction model based on multi-level network fusion Influence of rare earth element erbium on microstructures and properties of as-cast 8030 aluminum alloy The improvement of large-scale-region landslide susceptibility mapping accuracy by transfer learning Energy evolution model and energy response characteristics of freeze-thaw damaged sandstone under uniaxial compression A hybrid ventilation scheme applied to bi-directional excavation tunnel construction with a long inclined shaft
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1