Bjorn C. P. Sturmberg, Lahiru Hapuarachchi, Laura Jones, Kathryn Lucas-Healey, Justus van Biljon
{"title":"Vehicle-to-grid response to a frequency contingency in a national grid","authors":"Bjorn C. P. Sturmberg, Lahiru Hapuarachchi, Laura Jones, Kathryn Lucas-Healey, Justus van Biljon","doi":"10.1038/s44333-024-00010-8","DOIUrl":null,"url":null,"abstract":"Vehicle-to-grid technology enables electric vehicles to contribute their large, high-power batteries to power systems reserves. Here we report the first demonstration of a fleet of vehicles discharging to support system security after a frequency contingency in a national grid. Our results highlight the potential of vehicle-to-grid, with vehicles discharging within 6 s of the contingency event, and shortcomings, with vehicles recommencing charging before the power system had fully recovered.","PeriodicalId":501714,"journal":{"name":"npj Sustainable Mobility and Transport","volume":" ","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2024-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.nature.com/articles/s44333-024-00010-8.pdf","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"npj Sustainable Mobility and Transport","FirstCategoryId":"1085","ListUrlMain":"https://www.nature.com/articles/s44333-024-00010-8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Vehicle-to-grid technology enables electric vehicles to contribute their large, high-power batteries to power systems reserves. Here we report the first demonstration of a fleet of vehicles discharging to support system security after a frequency contingency in a national grid. Our results highlight the potential of vehicle-to-grid, with vehicles discharging within 6 s of the contingency event, and shortcomings, with vehicles recommencing charging before the power system had fully recovered.