Robust localization of shear connectors in accelerated bridge construction with neural radiance field

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY Automation in Construction Pub Date : 2024-10-24 DOI:10.1016/j.autcon.2024.105843
Gyumin Lee , Ali Turab Asad , Khurram Shabbir , Sung-Han Sim , Junhwa Lee
{"title":"Robust localization of shear connectors in accelerated bridge construction with neural radiance field","authors":"Gyumin Lee ,&nbsp;Ali Turab Asad ,&nbsp;Khurram Shabbir ,&nbsp;Sung-Han Sim ,&nbsp;Junhwa Lee","doi":"10.1016/j.autcon.2024.105843","DOIUrl":null,"url":null,"abstract":"<div><div>Accelerated bridge construction (ABC) demands precise alignment of prefabricated members to prevent assembly failure. Conventional methods struggle to localize shear connectors from point cloud data (PCD) generated by structure-from-motion due to its sparsity. This paper introduces a robust method for shear connector localization using PCD generated by a neural radiance field and a three-step narrowing-down algorithm. The PCD exhibits densely populated points for small connectors, allowing the algorithm to pinpoint their locations accurately. The method successfully identified all 72 shear connectors in a mock-up prefabricated girder, with an average error of 10 mm, demonstrating its potential for assessing constructability in ABC projects. Future research may integrate deep learning-based segmentation techniques to enhance efficiency and adaptability in complex geometries and non-standard bridge designs.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":null,"pages":null},"PeriodicalIF":9.6000,"publicationDate":"2024-10-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S092658052400579X","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

Accelerated bridge construction (ABC) demands precise alignment of prefabricated members to prevent assembly failure. Conventional methods struggle to localize shear connectors from point cloud data (PCD) generated by structure-from-motion due to its sparsity. This paper introduces a robust method for shear connector localization using PCD generated by a neural radiance field and a three-step narrowing-down algorithm. The PCD exhibits densely populated points for small connectors, allowing the algorithm to pinpoint their locations accurately. The method successfully identified all 72 shear connectors in a mock-up prefabricated girder, with an average error of 10 mm, demonstrating its potential for assessing constructability in ABC projects. Future research may integrate deep learning-based segmentation techniques to enhance efficiency and adaptability in complex geometries and non-standard bridge designs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用神经辐射场对加速桥梁施工中的剪力连接件进行稳健定位
加速桥梁施工(ABC)要求对预制构件进行精确对齐,以防止装配失败。由于点云数据(PCD)的稀疏性,传统方法很难从结构运动生成的点云数据中定位剪力连接件。本文介绍了一种使用神经辐射场生成的 PCD 和三步缩小算法进行剪力连接器定位的稳健方法。PCD 对小型连接器显示出密集的点,使算法能够精确定位其位置。该方法成功识别了模拟预制梁中的全部 72 个剪力连接件,平均误差为 10 毫米,证明了其在评估 ABC 项目可施工性方面的潜力。未来的研究可能会整合基于深度学习的分割技术,以提高复杂几何形状和非标准桥梁设计的效率和适应性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
期刊最新文献
Robust optimization model for traceable procurement of construction materials considering contract claims Editorial Board Rutting extraction from vehicle-borne laser point clouds Self-supervised monocular depth estimation on construction sites in low-light conditions and dynamic scenes Automated reinforcement of 3D-printed engineered cementitious composite beams
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1