Swiss highway project cost estimate performance: Deviations from norms and expected trends

IF 3.3 Q3 TRANSPORTATION Case Studies on Transport Policy Pub Date : 2025-03-01 Epub Date: 2024-12-10 DOI:10.1016/j.cstp.2024.101344
David Zani, Bryan T. Adey
{"title":"Swiss highway project cost estimate performance: Deviations from norms and expected trends","authors":"David Zani,&nbsp;Bryan T. Adey","doi":"10.1016/j.cstp.2024.101344","DOIUrl":null,"url":null,"abstract":"<div><div>Cost overruns in construction projects are a common issue internationally, and project cost performance in individual countries varies considerably. Countries that lack systematic project data may rely on foreign data for informing cost estimating practices and norms, which may lead to errors. This study considered the case of Switzerland, a country with limited research on construction project cost performance. Swiss highway construction projects were analysed to assess the accuracy of cost estimating methods and norms. Different factors influencing cost overruns were considered: project size, type, planning duration, start year, and historical policy changes. The results revealed that the general patterns of cost overruns observed internationally do not apply to Switzerland: projects tend to overrun estimated costs during the planning phase but underrun during the construction phase, leading to accurate overall cost estimates (4.7% median overrun). Projects exhibited large and asymmetrical cost accuracy ranges throughout the planning and construction phases. These results deviate from expectations set in norms and comparable international project data. Based on these findings, the study challenges the effectiveness of current Swiss cost estimating norms, suggesting a need for more country-specific data analysis and policy development.</div></div>","PeriodicalId":46989,"journal":{"name":"Case Studies on Transport Policy","volume":"19 ","pages":"Article 101344"},"PeriodicalIF":3.3000,"publicationDate":"2025-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Case Studies on Transport Policy","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2213624X24001998","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2024/12/10 0:00:00","PubModel":"Epub","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

Abstract

Cost overruns in construction projects are a common issue internationally, and project cost performance in individual countries varies considerably. Countries that lack systematic project data may rely on foreign data for informing cost estimating practices and norms, which may lead to errors. This study considered the case of Switzerland, a country with limited research on construction project cost performance. Swiss highway construction projects were analysed to assess the accuracy of cost estimating methods and norms. Different factors influencing cost overruns were considered: project size, type, planning duration, start year, and historical policy changes. The results revealed that the general patterns of cost overruns observed internationally do not apply to Switzerland: projects tend to overrun estimated costs during the planning phase but underrun during the construction phase, leading to accurate overall cost estimates (4.7% median overrun). Projects exhibited large and asymmetrical cost accuracy ranges throughout the planning and construction phases. These results deviate from expectations set in norms and comparable international project data. Based on these findings, the study challenges the effectiveness of current Swiss cost estimating norms, suggesting a need for more country-specific data analysis and policy development.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
瑞士公路项目成本估算绩效:偏离规范和预期趋势
建设项目成本超支是国际上普遍存在的问题,各个国家的项目成本绩效差异很大。缺乏系统项目数据的国家可能依赖外国数据为成本估算实践和规范提供信息,这可能导致错误。本研究考虑了瑞士的案例,这是一个对建筑项目成本绩效研究有限的国家。对瑞士公路建设项目的成本估算方法和规范的准确性进行了分析和评价。考虑了影响成本超支的不同因素:项目规模、类型、计划持续时间、开始年份和历史政策变化。结果显示,国际上观察到的成本超支的一般模式不适用于瑞士:项目往往在规划阶段超出估计成本,但在施工阶段超支,导致准确的总体成本估算(超支中位数为4.7%)。项目在整个规划和施工阶段都表现出巨大的不对称成本精度范围。这些结果偏离了规范和可比较的国际项目数据所设定的预期。基于这些发现,该研究对当前瑞士成本估算规范的有效性提出了挑战,建议需要进行更多针对具体国家的数据分析和政策制定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
5.00
自引率
12.00%
发文量
222
期刊最新文献
From gasoline to green: understanding the acceptance of electric motorcycles from the motorcyclists’ perspective – evidence from Tehran Connecting or dividing London? Evaluating the impact of the Elizabeth Line on job accessibility and spatial equity Simulation-based decision-making framework for sustainable intermodal transport including next-generation freight electric multiple-units Integrating non-motorized transportation with light rail transit: travel demand models for Rayong, Thailand Temporal heterogeneity in sociotechnical urban mobility systems: Evidence from distributed lag models in Curitiba, Brazil
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1