Heuristic approaches for a multi-mode resource availability cost problem in aircraft manufacturing

IF 4.3 2区 工程技术 Q2 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS Computers & Operations Research Pub Date : 2025-04-01 Epub Date: 2024-11-03 DOI:10.1016/j.cor.2024.106888
Jan Bierbüße , Lars Mönch , Alexander Biele
{"title":"Heuristic approaches for a multi-mode resource availability cost problem in aircraft manufacturing","authors":"Jan Bierbüße ,&nbsp;Lars Mönch ,&nbsp;Alexander Biele","doi":"10.1016/j.cor.2024.106888","DOIUrl":null,"url":null,"abstract":"<div><div>A multi-mode time-constrained project scheduling problem with generalized temporal constraints arising in aircraft manufacturing is studied in the paper. We propose a priority rule-based heuristic (PRH) and a biased random-key genetic algorithm (BRKGA) for its solution. A serial generation scheme (SGS) is used for computing schedules from a priority order of the tasks with given resource capacities and mode assignments. The SGS cannot guarantee that the maximum project duration and maximum time lags are respected. Starting with the highest possible resource capacities, the PRH performs the SGS in a repeated manner, reducing the least used resource capacity by one unit until the schedule becomes infeasible. Different priority rules are used for determining both mode assignments and task priority orders. We encode these two decisions as well as the resource capacities in the BRKGA and apply the SGS for decoding. Project duration and maximum time lag violations are penalized in the fitness function. Extensive computational experiments based on problem instances motivated by settings found at a large aircraft manufacturer demonstrate that the BRKGA outperforms the PRH under almost all experimental conditions, especially for problem instances with more complex networks and shorter maximum project durations.</div></div>","PeriodicalId":10542,"journal":{"name":"Computers & Operations Research","volume":"176 ","pages":"Article 106888"},"PeriodicalIF":4.3000,"publicationDate":"2025-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computers & Operations Research","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0305054824003605","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2024/11/3 0:00:00","PubModel":"Epub","JCR":"Q2","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

Abstract

A multi-mode time-constrained project scheduling problem with generalized temporal constraints arising in aircraft manufacturing is studied in the paper. We propose a priority rule-based heuristic (PRH) and a biased random-key genetic algorithm (BRKGA) for its solution. A serial generation scheme (SGS) is used for computing schedules from a priority order of the tasks with given resource capacities and mode assignments. The SGS cannot guarantee that the maximum project duration and maximum time lags are respected. Starting with the highest possible resource capacities, the PRH performs the SGS in a repeated manner, reducing the least used resource capacity by one unit until the schedule becomes infeasible. Different priority rules are used for determining both mode assignments and task priority orders. We encode these two decisions as well as the resource capacities in the BRKGA and apply the SGS for decoding. Project duration and maximum time lag violations are penalized in the fitness function. Extensive computational experiments based on problem instances motivated by settings found at a large aircraft manufacturer demonstrate that the BRKGA outperforms the PRH under almost all experimental conditions, especially for problem instances with more complex networks and shorter maximum project durations.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
飞机制造中多模式资源可用性成本问题的启发式方法
研究了飞机制造中具有广义时间约束的多模式时间约束项目调度问题。我们提出了一种基于优先级规则的启发式算法(PRH)和一种有偏随机密钥遗传算法(BRKGA)来解决这个问题。串行生成方案(SGS)用于根据给定资源容量和模式分配的任务优先级顺序计算调度。SGS不能保证最大项目持续时间和最大滞后时间得到遵守。从尽可能高的资源容量开始,PRH以重复的方式执行SGS,将最少使用的资源容量减少一个单位,直到计划变得不可行的。不同的优先级规则用于确定模式分配和任务优先级顺序。我们在BRKGA中对这两个决策以及资源容量进行编码,并应用SGS进行解码。项目持续时间和最大时间滞后违规在适应度函数中受到惩罚。基于大型飞机制造商设置的问题实例的大量计算实验表明,BRKGA在几乎所有实验条件下都优于PRH,特别是对于具有更复杂网络和更短最大项目持续时间的问题实例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Computers & Operations Research
Computers & Operations Research 工程技术-工程:工业
CiteScore
8.60
自引率
8.70%
发文量
292
审稿时长
8.5 months
期刊介绍: Operations research and computers meet in a large number of scientific fields, many of which are of vital current concern to our troubled society. These include, among others, ecology, transportation, safety, reliability, urban planning, economics, inventory control, investment strategy and logistics (including reverse logistics). Computers & Operations Research provides an international forum for the application of computers and operations research techniques to problems in these and related fields.
期刊最新文献
Beware of the classical benchmark instances for the Traveling Salesman Problem with Time Windows A speed-up for Helsgaun’s TSP heuristic by relaxing the positive gain criterion A memory-enhanced Greedy Randomized Adaptive Search Procedure for the Multi-Pickup and Delivery Problem with Time Windows A neural-driven constructive heuristic for the flexible job shop scheduling problem: An efficient alternative to complex deep learning methods Constraint programming approaches for stochastic Resource-Constrained Project Scheduling Problem subject to disruptions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1