Hyperbolic fuzzy set decision framework for construction contracts integrating CRITIC and WASPAS for dispute mitigation

IF 11.5 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY Automation in Construction Pub Date : 2025-03-20 DOI:10.1016/j.autcon.2025.106137
Edmundas Kazimieras Zavadskas , Raghunathan Krishankumar , Kattur Soundarapandian Ravichandran , Arvydas Vilkonis , Jurgita Antucheviciene
{"title":"Hyperbolic fuzzy set decision framework for construction contracts integrating CRITIC and WASPAS for dispute mitigation","authors":"Edmundas Kazimieras Zavadskas ,&nbsp;Raghunathan Krishankumar ,&nbsp;Kattur Soundarapandian Ravichandran ,&nbsp;Arvydas Vilkonis ,&nbsp;Jurgita Antucheviciene","doi":"10.1016/j.autcon.2025.106137","DOIUrl":null,"url":null,"abstract":"<div><div>The paper attempts to mitigate disputes during drafting of a construction contract by presenting a decision framework. The research questions considered are to set the main criteria involved and their relative importance in contract clauses selection and evaluate the priority of different contract clauses. In response, the paper presents an integrated framework involving hyperbolic fuzzy data, CRiteria Importance Through Intercriteria Correlation (CRITIC) method for criteria weight calculation, and query-based Weighted Aggregated Sum Product ASsessment (WASPAS) method for determining personalized priority of contract clauses. Results infer that work termination, customer reserve, guarantee periods and responsibilities of contractor/customer are the key criteria, and contract under the Fédération Internationale des Ingénieurs-Conseils (FIDIC) Yellow Book is of top priority. Such integrated framework serves as supplement to contractors and customers for prompt and rational decision-making by reducing human intervention, managing uncertainty, and reducing bias/subjectivity. In the future, plans are made to include a priori information into the decision framework.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"174 ","pages":"Article 106137"},"PeriodicalIF":11.5000,"publicationDate":"2025-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580525001773","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

The paper attempts to mitigate disputes during drafting of a construction contract by presenting a decision framework. The research questions considered are to set the main criteria involved and their relative importance in contract clauses selection and evaluate the priority of different contract clauses. In response, the paper presents an integrated framework involving hyperbolic fuzzy data, CRiteria Importance Through Intercriteria Correlation (CRITIC) method for criteria weight calculation, and query-based Weighted Aggregated Sum Product ASsessment (WASPAS) method for determining personalized priority of contract clauses. Results infer that work termination, customer reserve, guarantee periods and responsibilities of contractor/customer are the key criteria, and contract under the Fédération Internationale des Ingénieurs-Conseils (FIDIC) Yellow Book is of top priority. Such integrated framework serves as supplement to contractors and customers for prompt and rational decision-making by reducing human intervention, managing uncertainty, and reducing bias/subjectivity. In the future, plans are made to include a priori information into the decision framework.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
结合CRITIC和WASPAS的建筑合同争议缓解双曲模糊集决策框架
本文试图通过提出决策框架来减轻施工合同起草过程中的争议。考虑的研究问题是确定合同条款选择中涉及的主要标准及其相对重要性,并评估不同合同条款的优先级。为此,本文提出了一个包含双曲模糊数据的综合框架、用于标准权重计算的标准重要性通过标准间关联(critical)方法,以及用于确定合同条款个性化优先级的基于查询的加权总和产品评估(WASPAS)方法。结果表明,工作终止、客户储备、保修期和承包商/客户的责任是关键标准,而FIDIC黄皮书下的合同是最优先考虑的。这种集成框架通过减少人为干预、管理不确定性和减少偏见/主观性,为承包商和客户提供及时和理性的决策补充。在未来,制定计划将先验信息纳入决策框架。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
期刊最新文献
Optimizing on-site building material handling with construction robotics Multi-objective optimization of vector rhombus layout propulsion system for underwater dam defect detection vehicle Fuzzy spatiotemporal graph learning for uncertainty modeling in shield attitude prediction Integrating the Brick Schema and Control Description Language for automation and controls in BIM Street view imagery-based method for reconstructing 3D building façade openings
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1