{"title":"Contracting challenges in post-disaster reconstruction in developing countries: Evidence from Nepal reconstruction","authors":"Ayush Puri , Naseem Ameer Ali, Mohamed Elkharboutly","doi":"10.1016/j.ijdrr.2025.105428","DOIUrl":null,"url":null,"abstract":"<div><div>This study aims to identify the challenges of procuring and contracting post-disaster reconstruction projects in developing countries using conventional construction contracts, with Nepal as a case study. After the 7.6 Mw Gorkha Earthquake in 2015, Nepal embarked on extensive reconstruction efforts supported by various foreign governments and agencies. While these efforts were generally hailed as successful, large-scale non-residential reconstruction projects encountered significant challenges. This issue is common globally due to the lack of attention from researchers on large-scale non-residential reconstruction, leading to overlooked issues and the continuous failure of these projects to meet their objectives. One key issue in such projects is using conventional construction contracts not designed for post-disaster scenarios. This study used a qualitative research design that included semi-structured interviews to collect data and thematic analysis to gain insights from individuals involved in Nepal's reconstruction. Fifteen interviews with experts involved in managing construction contracts during the reconstruction were conducted and analysed using Nvivo 14 software. Upon analysis, two main themes emerged: procurement and bureaucratic, and contract-related, each further divided into sub-categories. These themes highlight how Procurement Act and conventional contracts used in reconstruction in Nepal failed to address post-disaster needs. The findings emphasise the necessity for pre-disaster evaluations and updates to procurement laws and contracts to establish more suitable approaches for reconstruction. Aligning contracts with the specific requirements of post-disaster contexts can significantly enhance the efficiency and effectiveness of reconstruction efforts. Future research should focus on developing disaster-focused contracts to enhance global reconstruction practices.</div></div>","PeriodicalId":13915,"journal":{"name":"International journal of disaster risk reduction","volume":"121 ","pages":"Article 105428"},"PeriodicalIF":4.5000,"publicationDate":"2025-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International journal of disaster risk reduction","FirstCategoryId":"89","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2212420925002523","RegionNum":1,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2025/3/26 0:00:00","PubModel":"Epub","JCR":"Q1","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
This study aims to identify the challenges of procuring and contracting post-disaster reconstruction projects in developing countries using conventional construction contracts, with Nepal as a case study. After the 7.6 Mw Gorkha Earthquake in 2015, Nepal embarked on extensive reconstruction efforts supported by various foreign governments and agencies. While these efforts were generally hailed as successful, large-scale non-residential reconstruction projects encountered significant challenges. This issue is common globally due to the lack of attention from researchers on large-scale non-residential reconstruction, leading to overlooked issues and the continuous failure of these projects to meet their objectives. One key issue in such projects is using conventional construction contracts not designed for post-disaster scenarios. This study used a qualitative research design that included semi-structured interviews to collect data and thematic analysis to gain insights from individuals involved in Nepal's reconstruction. Fifteen interviews with experts involved in managing construction contracts during the reconstruction were conducted and analysed using Nvivo 14 software. Upon analysis, two main themes emerged: procurement and bureaucratic, and contract-related, each further divided into sub-categories. These themes highlight how Procurement Act and conventional contracts used in reconstruction in Nepal failed to address post-disaster needs. The findings emphasise the necessity for pre-disaster evaluations and updates to procurement laws and contracts to establish more suitable approaches for reconstruction. Aligning contracts with the specific requirements of post-disaster contexts can significantly enhance the efficiency and effectiveness of reconstruction efforts. Future research should focus on developing disaster-focused contracts to enhance global reconstruction practices.
期刊介绍:
The International Journal of Disaster Risk Reduction (IJDRR) is the journal for researchers, policymakers and practitioners across diverse disciplines: earth sciences and their implications; environmental sciences; engineering; urban studies; geography; and the social sciences. IJDRR publishes fundamental and applied research, critical reviews, policy papers and case studies with a particular focus on multi-disciplinary research that aims to reduce the impact of natural, technological, social and intentional disasters. IJDRR stimulates exchange of ideas and knowledge transfer on disaster research, mitigation, adaptation, prevention and risk reduction at all geographical scales: local, national and international.
Key topics:-
-multifaceted disaster and cascading disasters
-the development of disaster risk reduction strategies and techniques
-discussion and development of effective warning and educational systems for risk management at all levels
-disasters associated with climate change
-vulnerability analysis and vulnerability trends
-emerging risks
-resilience against disasters.
The journal particularly encourages papers that approach risk from a multi-disciplinary perspective.