{"title":"A procedure for rating the dam safety improvement works","authors":"D. Stematiu, R. Drobot","doi":"10.56958/jesi.2021.6.3.9","DOIUrl":null,"url":null,"abstract":"Among the dam portofoliu administrated by an owner some dams show behaviour anomalies, progressive adverse phenomena or deficiencies of the equipment. The owner develops studies establishing the causes of the found phenomena and designs of the rehabilitation works for deficiencies remedy. Financing of the rehabilitation projects, sometimes requiring high costs, is usually provided from the owner’s own funds. Naturally, the funds that can be allotted are limited and very often cannot cover the costs required by all the technically approved works. Under these conditions, the funds distribution strategy should select primarily the works that contribute significantly to the dam’s safety improvement while in the meantime are bringing maximum benefit to the owner. A decision making strategy is developed in the present paper. Planning the rehabilitation works required by safety improvement is based on the combination of risk reduction and the efficiency of the intervention.","PeriodicalId":52936,"journal":{"name":"Journal of Engineering Sciences and Innovation","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Sciences and Innovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56958/jesi.2021.6.3.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Among the dam portofoliu administrated by an owner some dams show behaviour anomalies, progressive adverse phenomena or deficiencies of the equipment. The owner develops studies establishing the causes of the found phenomena and designs of the rehabilitation works for deficiencies remedy. Financing of the rehabilitation projects, sometimes requiring high costs, is usually provided from the owner’s own funds. Naturally, the funds that can be allotted are limited and very often cannot cover the costs required by all the technically approved works. Under these conditions, the funds distribution strategy should select primarily the works that contribute significantly to the dam’s safety improvement while in the meantime are bringing maximum benefit to the owner. A decision making strategy is developed in the present paper. Planning the rehabilitation works required by safety improvement is based on the combination of risk reduction and the efficiency of the intervention.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种评定大坝安全改进工程等级的程序
在业主管理的水坝组合中,一些水坝表现出行为异常,渐进的不利现象或设备缺陷。业主进行研究,确定所发现现象的原因和修复工程的设计,以弥补缺陷。修复项目的资金有时需要很高的费用,通常由业主自己的资金提供。当然,可以分配的资金是有限的,而且往往不能支付所有技术上核准的工程所需的费用。在这种情况下,资金分配策略应优先选择对大坝安全改善有重大贡献,同时又能给业主带来最大效益的工程。本文提出了一种决策策略。在规划改善安全所需的复修工程时,必须兼顾减低风险和提高干预措施的效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
Avaliação acústica de um cânion urbano Best operation strategies for piezoelectric vibration energy harvesters. II. Application to simple or induction-assisted resistive loads Some sulphur - containing double combination reagents Passing the systems among levels of quantum reality Stress state in perforated discs
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1