DETERMINATION OF THE COST COMPONENT IN THE SOCIAL COST-BENEFIT ANALYSIS OF ROAD PROJECTS IN SOUTH AFRICA

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2021-05-28 DOI:10.7166/32-1-2460
W. Pienaar
{"title":"DETERMINATION OF THE COST COMPONENT IN THE SOCIAL COST-BENEFIT ANALYSIS OF ROAD PROJECTS IN SOUTH AFRICA","authors":"W. Pienaar","doi":"10.7166/32-1-2460","DOIUrl":null,"url":null,"abstract":"The article deals with the preferred approach to determine the cost component in the social cost-benefit analysis (SCBA) of road projects in South Africa. The article is in four parts. The first part, the introduction, provides the reasons why investment cost should be identified as a single cost entity in the SCBA of a road project, regardless of the criteria according to which a project is adjudicated. The second part discusses the principles that guide the determination of the social opportunity costs (SOC) of road projects. The third part identifies the two items that form the cost component of the SCBA of road projects; the SOC of (i) the land required to accommodate the road reserve, and (ii) the construction of the road. The cost component of the latter is sub-divided into labour, plant, equipment, fuel, materials, and normal profit. The section also details a recommended procedure to convert the financial budget of a road construction project to an estimate of its SOC. The fourth section draws some conclusions from the study.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"177 ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/32-1-2460","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

The article deals with the preferred approach to determine the cost component in the social cost-benefit analysis (SCBA) of road projects in South Africa. The article is in four parts. The first part, the introduction, provides the reasons why investment cost should be identified as a single cost entity in the SCBA of a road project, regardless of the criteria according to which a project is adjudicated. The second part discusses the principles that guide the determination of the social opportunity costs (SOC) of road projects. The third part identifies the two items that form the cost component of the SCBA of road projects; the SOC of (i) the land required to accommodate the road reserve, and (ii) the construction of the road. The cost component of the latter is sub-divided into labour, plant, equipment, fuel, materials, and normal profit. The section also details a recommended procedure to convert the financial budget of a road construction project to an estimate of its SOC. The fourth section draws some conclusions from the study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
南非公路项目社会成本效益分析中成本构成的确定
本文讨论了在南非公路项目的社会成本效益分析中确定成本构成的首选方法。这篇文章分为四个部分。第一部分,引言,提供了为什么投资成本应被确定为道路项目SCBA中的单一成本实体的原因,而不考虑项目的裁决标准。第二部分论述了指导公路项目社会机会成本确定的原则。第三部分确定了构成公路项目SCBA成本构成的两个项目;(i)容纳道路预留区所需的土地和(ii)道路建设的SOC。后者的成本构成分为劳动力、厂房、设备、燃料、材料和正常利润。本节还详细介绍了将道路建设项目的财务预算转换为SOC估计的建议程序。第四节从研究中得出了一些结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1