Energietransition im Rheinischen Revier – Implikationen der Projektförderung für eine grüne Pfadentwicklung

Mascha Aring, M. Breul, Javier Revilla Diez
{"title":"Energietransition im Rheinischen Revier – Implikationen der Projektförderung für eine grüne Pfadentwicklung","authors":"Mascha Aring, M. Breul, Javier Revilla Diez","doi":"10.14512/rur.174","DOIUrl":null,"url":null,"abstract":"Abstract  \nWith the phase-out of lignite, the Rhenish mining area is at the beginning of a transformation process that will take decades. Structural funds of almost 15 billion euros are to be allocated as project funding until 2038. The basis for this is the economic and structural programme and a regional consensus with representatives of the region. The aim of this paper is to investigate to what extent the funding project selection helps to establish green development paths and move closer to the ambitious goal of a sustainable model region for energy supply and production. For this purpose, the characteristics of 22 submitted projects in the “Zukunftsfeld” energy and industry are analysed with regard to a typology of green paths. With the help of nine interviews, framework conditions (design of the funding process and resource endowment of the actors) that influence green path development processes in the Rhenish Revier could be identified. Path renewal processes of the regional industry as well as path creation dynamics especially in the hydrogen sector can be found. Overall, the project selection is determined by a high proportion of knowledge institutions, whose participation is favoured by the framework conditions. The participation of small and medium sized enterprises and municipalities, on the other hand, is hampered by the framework conditions, which means that existing regional potentials are not utilized optimally and the transformation process as a whole can be compromised.","PeriodicalId":45221,"journal":{"name":"Raumforschung und Raumordnung-Spatial Research and Planning","volume":" ","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2022-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Raumforschung und Raumordnung-Spatial Research and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14512/rur.174","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOGRAPHY","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract   With the phase-out of lignite, the Rhenish mining area is at the beginning of a transformation process that will take decades. Structural funds of almost 15 billion euros are to be allocated as project funding until 2038. The basis for this is the economic and structural programme and a regional consensus with representatives of the region. The aim of this paper is to investigate to what extent the funding project selection helps to establish green development paths and move closer to the ambitious goal of a sustainable model region for energy supply and production. For this purpose, the characteristics of 22 submitted projects in the “Zukunftsfeld” energy and industry are analysed with regard to a typology of green paths. With the help of nine interviews, framework conditions (design of the funding process and resource endowment of the actors) that influence green path development processes in the Rhenish Revier could be identified. Path renewal processes of the regional industry as well as path creation dynamics especially in the hydrogen sector can be found. Overall, the project selection is determined by a high proportion of knowledge institutions, whose participation is favoured by the framework conditions. The participation of small and medium sized enterprises and municipalities, on the other hand, is hampered by the framework conditions, which means that existing regional potentials are not utilized optimally and the transformation process as a whole can be compromised.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在莱茵辖区转运能源——绿色路径开发项目资金影响
随着褐煤的逐步淘汰,莱茵矿区正处于转型过程的开始,这将需要几十年的时间。到2038年,将近150亿欧元的结构性基金将作为项目资金分配。这方面的基础是经济和结构方案以及与该区域代表达成的区域协商一致意见。本文的目的是探讨资助项目选择在多大程度上有助于建立绿色发展道路,并更接近可持续能源供应和生产示范地区的宏伟目标。为此,对“zukuntsfeld”能源和工业领域22个提交项目的特点进行了绿色路径类型分析。通过九次访谈,可以确定影响莱茵河绿色路径发展过程的框架条件(资助过程的设计和行动者的资源禀赋)。可以发现区域工业的路径更新过程以及路径创造动态,特别是在氢部门。总体而言,项目选择是由高比例的知识机构决定的,框架条件有利于知识机构的参与。另一方面,中小型企业和市政当局的参与受到框架条件的阻碍,这意味着现有的区域潜力没有得到最佳利用,整个转变过程可能受到损害。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.50
自引率
28.60%
发文量
54
审稿时长
29 weeks
期刊最新文献
Social logistics: Rethinking public transport as a regional distributor of goods in rural areas. Chances for the long-term establishment of a sustainable regional logistics approach Post-school education in shrinking rural regions: experiences and solutions from Scotland and Sweden Potentials of Climate Emergency Declarations for degrowth transformations. The ambivalent stance of German municipalities in conflicts over a post-fossil future Book review of: Gunder, Michael; Grange, Kristina; Winkler, Tanja (eds.) (2023): Handbook on Planning and Power Planungskonflikte in der pluralistischen Demokratie: agonistische Planung zwischen Theorie und Praxis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1