PREVISION AND OPTIMISATION OF REPAIRABLE SPARE PARTS: A CASE STUDY IN THE PETROLEUM INDUSTRY

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2020-08-30 DOI:10.7166/31-2-2221
Danilo Gonçalves Calvacante, Luciano Ferreira, D. Borenstein
{"title":"PREVISION AND OPTIMISATION OF REPAIRABLE SPARE PARTS: A CASE STUDY IN THE PETROLEUM INDUSTRY","authors":"Danilo Gonçalves Calvacante, Luciano Ferreira, D. Borenstein","doi":"10.7166/31-2-2221","DOIUrl":null,"url":null,"abstract":"This study was motivated by the high costs incurred by an energy company for repairable spare parts for faulty mission-critical items, particularly with those that operate until failure. The objective of this paper is to develop and apply a method for repairable spare part inventory management of run-to-failure equipment. To achieve a robust method that incorporates the data collected from previous failures, such as environmental factors and operating conditions, we propose an optimisation approach based on an accelerated failure time model. Accelerated failure time is used as a reliability regression model with covariates to describe different operational conditions. An algorithm is also developed to consider the repairable nature of the equipment, predicting the number of spare parts based on the expected number of failures in the period and the equipment repair cycle. The proposed method is applied using data from three different power units of electrical submersible pumps, a mission-critical item in oil production. The results show an average reduction of 60.6 per cent in the required number of spare parts, considering an average fill rate of 95.33 per cent. This reduction implies an estimated annual savings of around US$664,720 in inventory costs, considering the analysed units.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"31 1","pages":"156-171"},"PeriodicalIF":0.5000,"publicationDate":"2020-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/31-2-2221","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

Abstract

This study was motivated by the high costs incurred by an energy company for repairable spare parts for faulty mission-critical items, particularly with those that operate until failure. The objective of this paper is to develop and apply a method for repairable spare part inventory management of run-to-failure equipment. To achieve a robust method that incorporates the data collected from previous failures, such as environmental factors and operating conditions, we propose an optimisation approach based on an accelerated failure time model. Accelerated failure time is used as a reliability regression model with covariates to describe different operational conditions. An algorithm is also developed to consider the repairable nature of the equipment, predicting the number of spare parts based on the expected number of failures in the period and the equipment repair cycle. The proposed method is applied using data from three different power units of electrical submersible pumps, a mission-critical item in oil production. The results show an average reduction of 60.6 per cent in the required number of spare parts, considering an average fill rate of 95.33 per cent. This reduction implies an estimated annual savings of around US$664,720 in inventory costs, considering the analysed units.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
可修复备件的预测与优化&以石油工业为例
这项研究的动机是,一家能源公司为有故障的关键任务项目,特别是那些一直运行到故障的项目,购买可修复备件的成本很高。本文的目的是开发和应用一种运行到故障设备的可修复备件库存管理方法。为了实现一种稳健的方法,该方法结合了从以前的故障中收集的数据,如环境因素和操作条件,我们提出了一种基于加速故障时间模型的优化方法。加速失效时间被用作具有协变量的可靠性回归模型,以描述不同的操作条件。还开发了一种算法来考虑设备的可修复性,根据该周期和设备维修周期中的预期故障数量预测备件数量。所提出的方法是使用来自石油生产中的关键项目电潜泵的三个不同动力单元的数据来应用的。结果显示,考虑到95.33%的平均填充率,所需备件数量平均减少了60.6%。这一减少意味着,考虑到所分析的单位,估计每年可节省约664720美元的库存成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1