Assessment of the Disaster Recovery Progress through Mathematical Modelling

IF 0.8 4区 工程技术 Q4 ENGINEERING, CIVIL Teknik Dergi Pub Date : 2020-07-01 DOI:10.18400/tekderg.473099
S. Ü. Dikmen, R. Akbiyikli, M. Sönmez
{"title":"Assessment of the Disaster Recovery Progress through Mathematical Modelling","authors":"S. Ü. Dikmen, R. Akbiyikli, M. Sönmez","doi":"10.18400/tekderg.473099","DOIUrl":null,"url":null,"abstract":"Natural disasters, especially major earthquakes, cause widespread devastation in the built environment. Hence, the major component of the recovery in its aftermath constitutes a chain of projects starting at different times, having different costs and durations. In this study, the post disaster recovery curve modelled through a mathematical approach taking into account these properties of the projects. The approach followed is based on the project S-curve concept that provides the opportunity to simulate the progress by outlining the project spending. Well-known mathematical functions are adapted to model the project spending and the handover processes. Monte Carlo simulation is performed to evaluate the general behavior of the recovery curve using the model developed. Weibull distribution is used to generate the model’s parameters. Results of the Monte Carlo simulation demonstrate that the recovery process exhibits an S-shape, the duration of initial portion and the slope of the bulk portion being significantly governed by the level of preparedness of the community.","PeriodicalId":49442,"journal":{"name":"Teknik Dergi","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teknik Dergi","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.18400/tekderg.473099","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

Abstract

Natural disasters, especially major earthquakes, cause widespread devastation in the built environment. Hence, the major component of the recovery in its aftermath constitutes a chain of projects starting at different times, having different costs and durations. In this study, the post disaster recovery curve modelled through a mathematical approach taking into account these properties of the projects. The approach followed is based on the project S-curve concept that provides the opportunity to simulate the progress by outlining the project spending. Well-known mathematical functions are adapted to model the project spending and the handover processes. Monte Carlo simulation is performed to evaluate the general behavior of the recovery curve using the model developed. Weibull distribution is used to generate the model’s parameters. Results of the Monte Carlo simulation demonstrate that the recovery process exhibits an S-shape, the duration of initial portion and the slope of the bulk portion being significantly governed by the level of preparedness of the community.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过数学模型评估灾后恢复进展
自然灾害,特别是大地震,会对建筑环境造成广泛的破坏。因此,灾后恢复的主要组成部分是在不同时间开始的一系列项目,其成本和持续时间各不相同。在本研究中,灾后恢复曲线通过数学方法建模,考虑到这些项目的属性。接下来的方法是基于项目s曲线概念,通过概述项目支出来模拟进度。众所周知的数学函数被用来模拟项目支出和移交过程。利用所建立的模型进行了蒙特卡罗模拟,以评估采收率曲线的一般行为。采用威布尔分布生成模型参数。蒙特卡罗模拟结果表明,恢复过程呈s形,初始部分的持续时间和大块部分的斜率受社区准备水平的显著支配。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Teknik Dergi
Teknik Dergi 工程技术-工程:土木
自引率
30.80%
发文量
65
审稿时长
>12 weeks
期刊介绍: The scope of Teknik Dergi is naturally confined with the subjects falling in the area of civil engineering. However, the area of civil engineering has recently been significantly enlarged, even the definition of civil engineering has somewhat changed. Half a century ago, engineering was simply defined as “the art of using and converting the natural resources for the benefit of the mankind”. Today, the same objective is expected to be realised (i) by complying with the desire and expectations of the people concerned and (ii) without wasting the resources and within the sustainability principles. This change has required an interaction between engineering and social and administrative sciences. Some subjects at the borderline between civil engineering and social and administrative sciences have consequently been included in the area of civil engineering. Teknik Dergi defines its scope in line with this understanding. However, it requires the papers falling in the borderline to have a significant component of civil engineering.
期刊最新文献
Scheduling, Management and Optimization of Construction Process A Downscaling Application for Local Meteorological Variables of Eastern Black Sea Basin and Scenario Based Predictions Developing a Performance-Based Payment Model in Urban Public Transport Systems Evaluation of Occupational Safety in the Operation and Maintenance Activities of Dams Determination of Finite Element Modelling Errors for Box Culverts Using Field Load Tests
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1