Time - Cost Relationships for Superstructure Projects in Turkey

IF 0.8 4区 工程技术 Q4 ENGINEERING, CIVIL Teknik Dergi Pub Date : 2020-03-01 DOI:10.18400/tekderg.456761
M. Sönmez, S. Ü. Dikmen, R. Akbiyikli
{"title":"Time - Cost Relationships for Superstructure Projects in Turkey","authors":"M. Sönmez, S. Ü. Dikmen, R. Akbiyikli","doi":"10.18400/tekderg.456761","DOIUrl":null,"url":null,"abstract":"The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bromilow used the data of the superstructure projects completed in Australia in the creation of the proposed time-cost model (BTC model). The aim of this study is to determine the time-cost relationship of superstructure projects in Turkey. Time and cost data of superstructure projects completed between the years of 1999-2018 was used in the study. Data was grouped primarily on the basis of the intended use of buildings (individual buildings, educational buildings, hospitals, industrial buildings and social housing), and then time-cost relationships were separately determined for each group. In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.","PeriodicalId":49442,"journal":{"name":"Teknik Dergi","volume":"31 1","pages":"9869-9896"},"PeriodicalIF":0.8000,"publicationDate":"2020-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teknik Dergi","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.18400/tekderg.456761","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 4

Abstract

The concept of time-cost relationship in construction projects was first introduced by Bromilow. Bromilow used the data of the superstructure projects completed in Australia in the creation of the proposed time-cost model (BTC model). The aim of this study is to determine the time-cost relationship of superstructure projects in Turkey. Time and cost data of superstructure projects completed between the years of 1999-2018 was used in the study. Data was grouped primarily on the basis of the intended use of buildings (individual buildings, educational buildings, hospitals, industrial buildings and social housing), and then time-cost relationships were separately determined for each group. In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
土耳其上部结构工程的时间成本关系
建筑项目中时间成本关系的概念最早由Bromlow提出。Bromlow在创建拟议的时间成本模型(BTC模型)时使用了在澳大利亚完成的上层建筑项目的数据。本研究的目的是确定土耳其上层建筑项目的时间成本关系。研究中使用了1999-2018年间完成的上部结构项目的时间和成本数据。数据主要根据建筑物的预期用途(单个建筑物、教育建筑物、医院、工业建筑物和社会住房)进行分组,然后分别确定每组的时间-成本关系。此外,还对汇率和非工作日数等参数对时间成本关系的影响进行了统计研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Teknik Dergi
Teknik Dergi 工程技术-工程:土木
自引率
30.80%
发文量
65
审稿时长
>12 weeks
期刊介绍: The scope of Teknik Dergi is naturally confined with the subjects falling in the area of civil engineering. However, the area of civil engineering has recently been significantly enlarged, even the definition of civil engineering has somewhat changed. Half a century ago, engineering was simply defined as “the art of using and converting the natural resources for the benefit of the mankind”. Today, the same objective is expected to be realised (i) by complying with the desire and expectations of the people concerned and (ii) without wasting the resources and within the sustainability principles. This change has required an interaction between engineering and social and administrative sciences. Some subjects at the borderline between civil engineering and social and administrative sciences have consequently been included in the area of civil engineering. Teknik Dergi defines its scope in line with this understanding. However, it requires the papers falling in the borderline to have a significant component of civil engineering.
期刊最新文献
Scheduling, Management and Optimization of Construction Process A Downscaling Application for Local Meteorological Variables of Eastern Black Sea Basin and Scenario Based Predictions Developing a Performance-Based Payment Model in Urban Public Transport Systems Evaluation of Occupational Safety in the Operation and Maintenance Activities of Dams Determination of Finite Element Modelling Errors for Box Culverts Using Field Load Tests
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1