Payment of Labour Wage for Construction Site Operations with Safety Risk

P. Okoye, K. Okolie, Oluchukwu Precious-Favour Nzeneri, G. C. Ohazulume
{"title":"Payment of Labour Wage for Construction Site Operations with Safety Risk","authors":"P. Okoye, K. Okolie, Oluchukwu Precious-Favour Nzeneri, G. C. Ohazulume","doi":"10.2478/mdke-2022-0009","DOIUrl":null,"url":null,"abstract":"Abstract The increasing rate of unsafe acts by construction workers during construction operations to earn more wages is raising new concerns due to its negative effects; including accidents on construction sites. This study, therefore, examined the relationship between the level of safety risk in different building construction operations/trades and methods of payment of wages for construction operatives to determine if the wage payment method was predicted by the level of risk in each operation. Prior to this, the study prioritised selected construction operations based on their safety risk level and rated the method of payment of wages for each operation based on their frequency of utilisation. A site-based survey was conducted using structured questionnaire and interview, administered to building tradesmen and labourers in South-East Nigeria. The study identified 12 high-risk level and 7 medium-risk level operations/trades. The study ranked roofing work as the riskiest building operation. It also found that negotiated lump sum, piece rate and time rate wage systems respectively, were the most prevalent wage payment systems in the payment of wages for operatives. Although the study also found that the level of risk has positive effect on the method of payment of wages (β = 0.214; t-stat = 0.640), it revealed that the level of risk involved in each operation/trade does not significantly predict the payment method used in payment of workers’ wages (F-Stat (0.409) < F-Critical (4.451); p (0.531) > 0.05). It identified negotiated lump sum wage payment method as an emerging wage payment system in Nigeria construction industry and suggested for further investigation to unravel the circumstances behind its high acceptance. The study then craved for review of existing labour laws in Nigeria to capture the new trends in the labour management of risky operations on construction sites.","PeriodicalId":53295,"journal":{"name":"Management Dynamics in the Knowledge Economy","volume":"10 1","pages":"124 - 141"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Dynamics in the Knowledge Economy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mdke-2022-0009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The increasing rate of unsafe acts by construction workers during construction operations to earn more wages is raising new concerns due to its negative effects; including accidents on construction sites. This study, therefore, examined the relationship between the level of safety risk in different building construction operations/trades and methods of payment of wages for construction operatives to determine if the wage payment method was predicted by the level of risk in each operation. Prior to this, the study prioritised selected construction operations based on their safety risk level and rated the method of payment of wages for each operation based on their frequency of utilisation. A site-based survey was conducted using structured questionnaire and interview, administered to building tradesmen and labourers in South-East Nigeria. The study identified 12 high-risk level and 7 medium-risk level operations/trades. The study ranked roofing work as the riskiest building operation. It also found that negotiated lump sum, piece rate and time rate wage systems respectively, were the most prevalent wage payment systems in the payment of wages for operatives. Although the study also found that the level of risk has positive effect on the method of payment of wages (β = 0.214; t-stat = 0.640), it revealed that the level of risk involved in each operation/trade does not significantly predict the payment method used in payment of workers’ wages (F-Stat (0.409) < F-Critical (4.451); p (0.531) > 0.05). It identified negotiated lump sum wage payment method as an emerging wage payment system in Nigeria construction industry and suggested for further investigation to unravel the circumstances behind its high acceptance. The study then craved for review of existing labour laws in Nigeria to capture the new trends in the labour management of risky operations on construction sites.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
有安全隐患的施工现场劳动工资的支付
建筑工人在施工过程中为赚取更多工资而采取的不安全行为越来越多,由于其负面影响而引起了新的关注;包括建筑工地的事故。因此,本研究考察了不同建筑施工作业/行业的安全风险水平与建筑作业人员工资支付方式之间的关系,以确定每个作业的风险水平是否可以预测工资支付方式。在此之前,该研究根据安全风险水平对选定的施工作业进行了优先排序,并根据使用频率对每个作业的工资支付方式进行了评级。对尼日利亚东南部的建筑工人和劳动者进行了一项基于现场的调查,使用结构化问卷和访谈。该研究确定了12个高风险级别和7个中等风险级别的操作/交易。该研究将屋顶工作列为最危险的建筑作业。调查还发现,协商一次总付工资、计件工资和计时工资制度分别是支付工人工资中最普遍的工资支付制度。虽然研究也发现风险水平对工资支付方式有正向影响(β = 0.214;t-stat = 0.640),这表明每个操作/交易所涉及的风险水平并不能显著预测工人工资支付方式(F-Stat (0.409) < F-Critical (4.451);P (0.531);确定了协商一次总付工资法是尼日利亚建筑业新兴的工资支付制度,并建议进一步调查,以揭示其高接受度背后的情况。然后,研究报告要求审查尼日利亚现有的劳工法,以便掌握建筑工地危险作业的劳工管理方面的新趋势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Financial Literacy and Entrepreneurial Risk Attitude of Selected Small and Medium Sized Enterprises in Nigeria The Dynamic Effect of Financial Sector Development in Stimulating the Gross National Savings of Djibouti Sharing Economy as Unconventional Alternative to Traditional Transport Services Bottleneck Identification through Simulation Modelling: A Case of Solid Tire Manufacturing Sector Harmonizing Sustainability Disclosure and Financial Performance. An In-depth Exploration within the European Energy Industry and Beyond
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1