Integral Formula for the Determination of Price Variations in Public Contracts of Road Works

IF 1.2 Q4 BUSINESS 3C Empresa Pub Date : 2020-08-24 DOI:10.17993/3cemp.2020.090343.97-107
Eddie Enzo Aronés Barbarán, Freddy Lizardo Kaseng Solis, C. Rodriguez
{"title":"Integral Formula for the Determination of Price Variations in Public Contracts of Road Works","authors":"Eddie Enzo Aronés Barbarán, Freddy Lizardo Kaseng Solis, C. Rodriguez","doi":"10.17993/3cemp.2020.090343.97-107","DOIUrl":null,"url":null,"abstract":"The objective of the research is to generate a new formula to determine the variation in prices in a public works contract that allows the financial balance of the counterparts. The methodology for calculating and adjusting the price variation in public works contracts is given as a function of the K factor, which is a number that comes from the calculation of polynomial formulas whose theoretical basis lies in the price indices, which are established in a legal framework of mandatory use of the polynomial formula to determine the K factor, with eight monomials in the budget and the quantity of supplies that exceeds one hundred. It is considered a subjective margin since its elaboration depends on the discretion of the one who elaborates on the polynomial formula. The investigation questions the procedure established by the state regulations for the calculation of the polynomial formula and shows the margin of error that exists between the value obtained by the method set for regulations and that obtained using the entries of the work budget. The result shows the positive variation in inputs, and the prices have increased, with adjustments paid in the contracts with the benefit of contractors.","PeriodicalId":40997,"journal":{"name":"3C Empresa","volume":"9 1","pages":"97-107"},"PeriodicalIF":1.2000,"publicationDate":"2020-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"3C Empresa","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17993/3cemp.2020.090343.97-107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

Abstract

The objective of the research is to generate a new formula to determine the variation in prices in a public works contract that allows the financial balance of the counterparts. The methodology for calculating and adjusting the price variation in public works contracts is given as a function of the K factor, which is a number that comes from the calculation of polynomial formulas whose theoretical basis lies in the price indices, which are established in a legal framework of mandatory use of the polynomial formula to determine the K factor, with eight monomials in the budget and the quantity of supplies that exceeds one hundred. It is considered a subjective margin since its elaboration depends on the discretion of the one who elaborates on the polynomial formula. The investigation questions the procedure established by the state regulations for the calculation of the polynomial formula and shows the margin of error that exists between the value obtained by the method set for regulations and that obtained using the entries of the work budget. The result shows the positive variation in inputs, and the prices have increased, with adjustments paid in the contracts with the benefit of contractors.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
道路工程公共合同价格变动确定的积分公式
本研究的目的是生成一个新的公式,以确定公共工程合同中允许对等方财务平衡的价格变化。计算和调整公共工程合同价格变动的方法是作为K因子的函数给出的,K因子是一个由多项式公式计算得出的数字,其理论基础是价格指数,价格指数是在强制使用多项式公式确定K因子的法律框架下建立的,预算中有8个单项,供应量超过100个。它被认为是一个主观的边际,因为它的阐述取决于阐述多项式公式的人的判断力。调查对国家规定的多项式公式的计算程序提出了质疑,并指出了用规定的方法得到的值与用工程预算分录得到的值之间存在的误差幅度。结果表明,投入的变化是正的,价格上升了,合同中支付的调整对承包商有利。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
3C Empresa
3C Empresa BUSINESS-
自引率
0.00%
发文量
7
审稿时长
12 weeks
期刊最新文献
Innovation of school-enterprise collaborative cultivation mode for university e-commerce majors in the context of symbiosis theory Analysis of digital information management of green ecological agriculture in the Northeast of my country under the environment of Agricultural products e-commerce Research on the impact of waste utilization in high-polluting enterprises on economic added value EVA from the perspective of low-carbon ecology Ecological construction and environmental management in large and medium-sized cities in the context of industry- city integration IOT financial management system for energy enterprise management risk and prevention and control strategy under the background of double carbon
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1