{"title":"The issue of accessibility of passengers to trains from platforms, analyzed in the IN2STEMPO project, implemented as part of the Shift2Rail initiative","authors":"Przemysław Brona, Grzegorz Stencel","doi":"10.35117/a_eng_21_05_02","DOIUrl":null,"url":null,"abstract":"Abstract: The article presents the main objectives of the IN2STEMPO project, implemented under the Shift2Rail initiative, with particular emphasis on the issue of accessibility to trains from platforms. These are preliminary studies prepared under the IN2STEMPO project, which will end in September 2022. A short description of the Shift2Rail initiative itself is also provided.. Keywords: Accessibility; Railway infrastructure","PeriodicalId":52762,"journal":{"name":"Przeglad Komunikacyjny","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przeglad Komunikacyjny","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35117/a_eng_21_05_02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract: The article presents the main objectives of the IN2STEMPO project, implemented under the Shift2Rail initiative, with particular emphasis on the issue of accessibility to trains from platforms. These are preliminary studies prepared under the IN2STEMPO project, which will end in September 2022. A short description of the Shift2Rail initiative itself is also provided.. Keywords: Accessibility; Railway infrastructure