Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry

IF 1.6 Q3 PUBLIC ADMINISTRATION Journal of Public Procurement Pub Date : 2020-04-25 DOI:10.1108/jopp-11-2019-0075
E. Kissi, T. Adjei-Kumi, Samuel Twum-Ampofo, C. Debrah
{"title":"Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry","authors":"E. Kissi, T. Adjei-Kumi, Samuel Twum-Ampofo, C. Debrah","doi":"10.1108/jopp-11-2019-0075","DOIUrl":null,"url":null,"abstract":"The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry.,From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry.,A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings.,The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability.,This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"20 1","pages":"313-330"},"PeriodicalIF":1.6000,"publicationDate":"2020-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1108/jopp-11-2019-0075","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jopp-11-2019-0075","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 18

Abstract

The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry.,From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry.,A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings.,The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability.,This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定加纳建筑业在实现物有所值方面的潜在缺点
没有实现最有价值的项目仍然是建筑业的一个长期问题。本文旨在找出影响加纳建筑业实现物有所值(VfM)的潜在缺陷。,通过全面的文献综述和试点调查,确定了18个导致VfM未实现的变量。通过有目的和滚雪球式的抽样技术,对目标专业人员进行了问卷调查。因子分析用于确定加纳建筑业VfM成就相同维度背后的潜在缺陷。,共有六个组成部分被确定并解释为外部因素;制度文化和政策制约;技术和决策因素;与人有关的因素以及问责制和透明度方面的制约因素。相对重要性指数用于分析解决不足的策略。,项目交付不佳的普遍情况和VfM的持续运动需要进行研究,以解释加纳建筑业在实现VfM方面的潜在缺陷。建议政府对公共项目中的VfM给予高度重视。这将有助于在不影响质量的情况下降低建筑项目的总体成本。当VfM得到认真对待时,政府可以节省更多的资金,承担更多的项目,并在透明度和问责制方面获得公众的认可。,这项研究确定了其他发展中国家可以效仿的潜在缺陷,为VfM分析的进一步研究奠定了基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Public Procurement
Journal of Public Procurement PUBLIC ADMINISTRATION-
CiteScore
4.40
自引率
4.00%
发文量
13
期刊介绍: The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.
期刊最新文献
Approaching transcendence: a conceptual discussion on procurement fraud, education, professionalism maturity, ethics and implications Procurement practices and operational performance: a study of linear and curvilinear relationships in a developing economy The predicting role of sustainable supplier selection on lead-time performance in public procurement: relational capability as a moderator Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa Streamlining professionalisation in public procurement: Romanian competency frameworks as a case study (Part B)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1