Production Planning and Engineering Process Improvement

N. Medhin, R. Uzsoy
{"title":"Production Planning and Engineering Process Improvement","authors":"N. Medhin, R. Uzsoy","doi":"10.46719/dsa20202922","DOIUrl":null,"url":null,"abstract":"The authors present an optimal control model to allocated equipment capacity between production that generates immediate revenue and engineering process improvement activity that results in increased future output. The benefit of engineering activity is modeled as a concave function of the total number of engineering lots processed to date, while the production facility is represented by a nonlinear clearing function capturing the nonlinear relationship between resource utilization and cycle time. We analyze the model to develop structural results and illustrates its behavior with numerical experiments.","PeriodicalId":92887,"journal":{"name":"Communications in applied analysis","volume":"22 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Communications in applied analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46719/dsa20202922","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The authors present an optimal control model to allocated equipment capacity between production that generates immediate revenue and engineering process improvement activity that results in increased future output. The benefit of engineering activity is modeled as a concave function of the total number of engineering lots processed to date, while the production facility is represented by a nonlinear clearing function capturing the nonlinear relationship between resource utilization and cycle time. We analyze the model to develop structural results and illustrates its behavior with numerical experiments.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
生产计划和工程流程改进
作者提出了一个优化控制模型,在产生即时收入的生产和增加未来产量的工程过程改进活动之间分配设备容量。工程活动的效益被建模为迄今为止处理的工程批总数的凹函数,而生产设施则由捕捉资源利用率和循环时间之间非线性关系的非线性清除函数表示。我们分析了该模型以发展结构结果,并通过数值实验说明了其行为。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Production Planning and Engineering Process Improvement Estimation of the Distribution of Random Parameters in Discrete Time Abstract Parabolic Systems with Unbounded Input and Output: Approximation and Convergence. OPTIMAL SEARCH FOR NONLINEAR DISCRETE SYSTEMS CYCLES ASYMPTOTIC STABILITY OF FUNCTIONAL EQUATIONS BY FIXED POINT THEOREMS THE TRAVELING WAVE OF AUTO-CATALYTIC SYSTEMS – THE LIMITING CASES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1