A non-cooperative multi-leader one-follower integrated generation maintenance scheduling problem under the risk of generation units’ disruption and variation in demands
{"title":"A non-cooperative multi-leader one-follower integrated generation maintenance scheduling problem under the risk of generation units’ disruption and variation in demands","authors":"Atefeh Hassanpour, Emad Roghanian, Mahdi Bashiri","doi":"10.1007/s10479-023-05553-6","DOIUrl":null,"url":null,"abstract":"<div><p>The generation maintenance scheduling deals with a time sequence of preventive maintenance outages for a given set of generation units in an electricity market subject to power system restrictions. Incorporating a leader–follower structure in generation maintenance scheduling models is essential because of the inherent conflict between the interests of an independent system operator (ISO) and generation companies (GENCOs). The present paper proposes a new preventive maintenance scheduling model for generation companies facing the risk of involving generation units’ disruption and demand variations while ensuring the reliability of the power system. Each GENCO proposes the maintenance schedule of its generation units to the ISO in a non-cooperative manner intending to maximize its net profit. Then ISO reacts to the aggregated schedule according to the power system’s reliability index. Thus, a new formula is developed to consider all the interactions between the power system’s stakeholders. In this regard, a stochastic multi-leader one-follower approach is applied. The GENCOs are considered independent leaders at the upper-level and the ISO is considered a follower at the lower-level. Then an equivalent single-level counterpart model is presented for each leader. So, the whole problem is converted into multiple individual stochastic single-level models, and then the Nash Equilibrium concept is used to determine GENCO equilibrium strategies. The proposed methodology is evaluated using some modified IEEE reliability test systems. The numerical analysis confirms that the proposed model is more effective in cases with higher uncertainties. Moreover, the performed analysis demonstrated the importance of applying a bi-level approach to the problem. Finally, the superiority of the proposed approach compared to the existing one is confirmed.</p></div>","PeriodicalId":8215,"journal":{"name":"Annals of Operations Research","volume":"336 3","pages":"1591 - 1635"},"PeriodicalIF":4.4000,"publicationDate":"2023-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of Operations Research","FirstCategoryId":"91","ListUrlMain":"https://link.springer.com/article/10.1007/s10479-023-05553-6","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0
Abstract
The generation maintenance scheduling deals with a time sequence of preventive maintenance outages for a given set of generation units in an electricity market subject to power system restrictions. Incorporating a leader–follower structure in generation maintenance scheduling models is essential because of the inherent conflict between the interests of an independent system operator (ISO) and generation companies (GENCOs). The present paper proposes a new preventive maintenance scheduling model for generation companies facing the risk of involving generation units’ disruption and demand variations while ensuring the reliability of the power system. Each GENCO proposes the maintenance schedule of its generation units to the ISO in a non-cooperative manner intending to maximize its net profit. Then ISO reacts to the aggregated schedule according to the power system’s reliability index. Thus, a new formula is developed to consider all the interactions between the power system’s stakeholders. In this regard, a stochastic multi-leader one-follower approach is applied. The GENCOs are considered independent leaders at the upper-level and the ISO is considered a follower at the lower-level. Then an equivalent single-level counterpart model is presented for each leader. So, the whole problem is converted into multiple individual stochastic single-level models, and then the Nash Equilibrium concept is used to determine GENCO equilibrium strategies. The proposed methodology is evaluated using some modified IEEE reliability test systems. The numerical analysis confirms that the proposed model is more effective in cases with higher uncertainties. Moreover, the performed analysis demonstrated the importance of applying a bi-level approach to the problem. Finally, the superiority of the proposed approach compared to the existing one is confirmed.
期刊介绍:
The Annals of Operations Research publishes peer-reviewed original articles dealing with key aspects of operations research, including theory, practice, and computation. The journal publishes full-length research articles, short notes, expositions and surveys, reports on computational studies, and case studies that present new and innovative practical applications.
In addition to regular issues, the journal publishes periodic special volumes that focus on defined fields of operations research, ranging from the highly theoretical to the algorithmic and the applied. These volumes have one or more Guest Editors who are responsible for collecting the papers and overseeing the refereeing process.