Analysis of the Possibility of Introducing the Reduction of Changeover Time of Selected CNC Machines Using the SMED Method

IF 1.9 Q3 ENGINEERING, INDUSTRIAL Production Engineering Archives Pub Date : 2023-02-15 DOI:10.30657/pea.2023.29.10
B. Oleksiak, B. Ciecińska, Piotr Ołów, Małgorzata Hordyńska
{"title":"Analysis of the Possibility of Introducing the Reduction of Changeover Time of Selected CNC Machines Using the SMED Method","authors":"B. Oleksiak, B. Ciecińska, Piotr Ołów, Małgorzata Hordyńska","doi":"10.30657/pea.2023.29.10","DOIUrl":null,"url":null,"abstract":"Abstract The paper presents the results of improving the production process using the SMED method. The process improvement was carried out in a company in the construction industry, using a machine park consisting of CNC machines. The study evaluated the current state of changeover times for selected CNC machines and proposed a reduction in changeover times for the machine park analysed. By introducing changes to the changeover process on selected CNC machines, it was possible to minimise the changeover time by more than 20% on all the machines analysed. The proposed reorganisation of the CNC operators’ workstations resulted in a time reduction of approximately 61% for machine 1, 52% for machine 2 and 12% for machine 3. The installation of barcode readers on the profiles, on the other hand, made it possible to load the machining programmes into the CNC machines more quickly and resulted in a reduction in loading time of approximately 88% on average for each of the machines analysed.","PeriodicalId":36269,"journal":{"name":"Production Engineering Archives","volume":"29 1","pages":"83 - 93"},"PeriodicalIF":1.9000,"publicationDate":"2023-02-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Engineering Archives","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30657/pea.2023.29.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract The paper presents the results of improving the production process using the SMED method. The process improvement was carried out in a company in the construction industry, using a machine park consisting of CNC machines. The study evaluated the current state of changeover times for selected CNC machines and proposed a reduction in changeover times for the machine park analysed. By introducing changes to the changeover process on selected CNC machines, it was possible to minimise the changeover time by more than 20% on all the machines analysed. The proposed reorganisation of the CNC operators’ workstations resulted in a time reduction of approximately 61% for machine 1, 52% for machine 2 and 12% for machine 3. The installation of barcode readers on the profiles, on the other hand, made it possible to load the machining programmes into the CNC machines more quickly and resulted in a reduction in loading time of approximately 88% on average for each of the machines analysed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采用SMED方法减少选定数控机床切换时间的可能性分析
摘要本文介绍了采用SMED方法改进生产工艺的结果。工艺改进是在一家建筑行业的公司进行的,使用由数控机床组成的机器园区。该研究评估了所选数控机床切换时间的现状,并提出了减少所分析机床园区切换时间的建议。通过对所选数控机床的转换过程进行更改,可以将所有分析机床的转换时间缩短20%以上。提议的CNC操作员工作站重组导致机器1的时间减少了约61%,机器2的时间减少了52%,机器3的时间减少了12%。另一方面,在配置文件上安装条码读取器,可以更快地将加工程序加载到CNC机器中,并使所分析的每台机器的加载时间平均减少约88%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Production Engineering Archives
Production Engineering Archives Engineering-Industrial and Manufacturing Engineering
CiteScore
6.10
自引率
13.00%
发文量
50
审稿时长
6 weeks
期刊最新文献
Shallot Price Forecasting Models: Comparison among Various Techniques Framework for Increasing Eco-efficiency in the Tofu Production Process: Circular Economy Approach Diagnostic methods and ways of testing the workability of coal - a review Company Cybersecurity System: Assessment, Risks and Expectations Experimental-numerical analysis of the fracture process in smooth and notched V specimens
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1