Daiane Alves de Vargas, Franciny Lieny Souza, Jean Alberto Sampietro, Marcos Filipe Nicoletti, M. Bonazza, Larissa Regina Topanotti
{"title":"Comparison of Forwarder Productivity and Optimal Road Density in Thinning and Clearcutting of Pine Plantation in Southern Brazil","authors":"Daiane Alves de Vargas, Franciny Lieny Souza, Jean Alberto Sampietro, Marcos Filipe Nicoletti, M. Bonazza, Larissa Regina Topanotti","doi":"10.5552/crojfe.2022.1147","DOIUrl":null,"url":null,"abstract":"The prescription of forest management determines the number of trees to be cut and, consequently, the harvested wood volume, which directly influences the forest operations dynamic. The objectives of this paper were (i) to analyze the effect of process factors on wood extraction performance with forwarder in first thinning and clearcutting of Pinus taeda L. plantations; and (ii) to economically determine the optimal road density to manage these plantations. Time and motion studies at the cycle element level were conducted to quantify and model the time consumption, productivity, and operational costs of the extraction. The optimal road density (ORD) for both operation types (OT) was determined based on the transport geometry model, considering the minimization of the sum of unitary costs with construction and maintenance of roads, loss of productive area, and wood extraction. The extraction distance (ED), slope (SL), average log volume (LV), and OT had a significant effect on the time consumed in travels, and therefore, on productivity (PPMH). In clearcutting, the average PPMH was 12.17 m3ob PMH0-1, while, in thinning, it was 10.94 m3ob PMH0-1; however, as the ED increased, the difference of PPMH and the cost of extraction between the operations decreased, which highlighted a greater effect of this factor on forwarder’s work in clearcutting. For this reason, the ORD for clearcutting (37.76 m ha-1) was higher than for thinning (27.84 m ha-1). Therefore, we demonstrated in this study that the type of operation and forest management regime, as well as their interaction with process factors, affect the sizing of the number of roads per unit area, and also the costs of the forest activity.","PeriodicalId":55204,"journal":{"name":"Croatian Journal of Forest Engineering","volume":" ","pages":""},"PeriodicalIF":2.7000,"publicationDate":"2021-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Croatian Journal of Forest Engineering","FirstCategoryId":"97","ListUrlMain":"https://doi.org/10.5552/crojfe.2022.1147","RegionNum":2,"RegionCategory":"农林科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"FORESTRY","Score":null,"Total":0}
引用次数: 1
Abstract
The prescription of forest management determines the number of trees to be cut and, consequently, the harvested wood volume, which directly influences the forest operations dynamic. The objectives of this paper were (i) to analyze the effect of process factors on wood extraction performance with forwarder in first thinning and clearcutting of Pinus taeda L. plantations; and (ii) to economically determine the optimal road density to manage these plantations. Time and motion studies at the cycle element level were conducted to quantify and model the time consumption, productivity, and operational costs of the extraction. The optimal road density (ORD) for both operation types (OT) was determined based on the transport geometry model, considering the minimization of the sum of unitary costs with construction and maintenance of roads, loss of productive area, and wood extraction. The extraction distance (ED), slope (SL), average log volume (LV), and OT had a significant effect on the time consumed in travels, and therefore, on productivity (PPMH). In clearcutting, the average PPMH was 12.17 m3ob PMH0-1, while, in thinning, it was 10.94 m3ob PMH0-1; however, as the ED increased, the difference of PPMH and the cost of extraction between the operations decreased, which highlighted a greater effect of this factor on forwarder’s work in clearcutting. For this reason, the ORD for clearcutting (37.76 m ha-1) was higher than for thinning (27.84 m ha-1). Therefore, we demonstrated in this study that the type of operation and forest management regime, as well as their interaction with process factors, affect the sizing of the number of roads per unit area, and also the costs of the forest activity.
森林经营的规定决定了砍伐树木的数量,从而决定了采伐木材的数量,这直接影响到森林经营的动态。本文的研究目的是:(1)分析了不同工艺因素对杉木初次间伐和采伐过程中木材提取性能的影响;(2)经济地确定管理这些人工林的最佳道路密度。在循环元素水平上进行时间和运动研究,以量化和建模提取的时间消耗、生产率和操作成本。基于运输几何模型,考虑到道路建设和维护、生产面积损失和木材开采的单一成本总和的最小化,确定了两种操作类型(OT)的最佳道路密度(ORD)。提取距离(ED)、坡度(SL)、平均对数体积(LV)和作业时间(OT)对行程中消耗的时间有显著影响,因此对生产率(PPMH)也有显著影响。伐林的平均PPMH为12.17 m30 ob PMH0-1,伐林的平均PPMH为10.94 m30 ob PMH0-1;然而,随着ED的增加,操作之间PPMH和提取成本的差异减小,这突出了这一因素对货代在清伐工作中的影响更大。因此,伐林的ORD (37.76 m ha-1)高于疏林(27.84 m ha-1)。因此,我们在这项研究中证明,经营类型和森林管理制度,以及它们与过程因素的相互作用,会影响每单位面积道路数量的大小,也会影响森林活动的成本。
期刊介绍:
Croatian Journal of Forest Engineering (CROJFE) is a refereed journal distributed internationally, publishing original research articles concerning forest engineering, both theoretical and empirical. The journal covers all aspects of forest engineering research, ranging from basic to applied subjects. In addition to research articles, preliminary research notes and subject reviews are published.
Journal Subjects and Fields:
-Harvesting systems and technologies-
Forest biomass and carbon sequestration-
Forest road network planning, management and construction-
System organization and forest operations-
IT technologies and remote sensing-
Engineering in urban forestry-
Vehicle/machine design and evaluation-
Modelling and sustainable management-
Eco-efficient technologies in forestry-
Ergonomics and work safety