Developing a novel based productivity model by investigating potential bounds of production plant: A case study.

IF 1.3 Q3 ENGINEERING, MULTIDISCIPLINARY International Journal of Production Management and Engineering Pub Date : 2019-07-31 DOI:10.4995/IJPME.2019.10911
Z. Hussain
{"title":"Developing a novel based productivity model by investigating potential bounds of production plant: A case study.","authors":"Z. Hussain","doi":"10.4995/IJPME.2019.10911","DOIUrl":null,"url":null,"abstract":"Productivity level is based on reliability impression which is the rudimentary aspect of automatic assembly line for continuous production. Productivity forecasting is a professional tool helping to enhance production system and attain the client petition by using precise model. Due to mechanisms complexity of assembly lines, analysis of failure factors contributes a significant role for investigating potential bounds that require analytial approach for comparison the current and proposed model of productivity effects. The issues related to production losses need additional space for improvement of productivity model which may not present a close comparison between the current and proposed model of productivity. Through this paper the development of a novel based productivity model is attempted to extant comparisons for availability of assembly line workspaces of an automobile tire manufacturing plant in Pakistan. For investigating the potential bounds of productivity losses, DMAIC and PACE techniques are used. It is verified that novel productivity model yielded better results of 3.358 % errors showing its accuracy as compared to real productivity level at different workspaces. Different rates of production losses followed by the workspaces blockage timing issues are effectively discussed with engineering maintainable explanation for productivity enhancement within the tire curing assembly line.","PeriodicalId":41823,"journal":{"name":"International Journal of Production Management and Engineering","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Production Management and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4995/IJPME.2019.10911","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 4

Abstract

Productivity level is based on reliability impression which is the rudimentary aspect of automatic assembly line for continuous production. Productivity forecasting is a professional tool helping to enhance production system and attain the client petition by using precise model. Due to mechanisms complexity of assembly lines, analysis of failure factors contributes a significant role for investigating potential bounds that require analytial approach for comparison the current and proposed model of productivity effects. The issues related to production losses need additional space for improvement of productivity model which may not present a close comparison between the current and proposed model of productivity. Through this paper the development of a novel based productivity model is attempted to extant comparisons for availability of assembly line workspaces of an automobile tire manufacturing plant in Pakistan. For investigating the potential bounds of productivity losses, DMAIC and PACE techniques are used. It is verified that novel productivity model yielded better results of 3.358 % errors showing its accuracy as compared to real productivity level at different workspaces. Different rates of production losses followed by the workspaces blockage timing issues are effectively discussed with engineering maintainable explanation for productivity enhancement within the tire curing assembly line.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过调查生产工厂的潜在边界,开发一种新的基于生产力的模型:一个案例研究。
生产率水平是基于可靠性印象的,可靠性印象是连续生产自动装配线的基本方面。生产力预测是一种专业的工具,通过使用精确的模型来帮助增强生产系统并获得客户申请。由于装配线的机制复杂性,故障因素的分析在研究潜在界限方面发挥着重要作用,这些界限需要分析方法来比较当前和提出的生产率效应模型。与生产损失相关的问题需要额外的空间来改进生产力模型,这可能无法在当前和拟议的生产力模型之间进行密切的比较。通过本文,试图开发一种新的基于生产力的模型,以比较巴基斯坦一家汽车轮胎制造厂装配线工作空间的可用性。为了研究生产率损失的潜在界限,使用了DMAIC和PACE技术。经验证,与不同工作空间的实际生产力水平相比,新的生产力模型产生了更好的结果,误差为3.358%,表明了其准确性。有效地讨论了不同的生产损失率以及工作空间堵塞时间问题,并对轮胎硫化装配线内的生产率提高进行了工程可维护的解释。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.10
自引率
13.30%
发文量
18
审稿时长
20 weeks
期刊最新文献
Sequential use of blocplan, solver, and particle swarm optimization (PSO) to optimize the double row facility layout Integrating human-centric simulations in educational production lines: advancing ergonomics for industry 5.0 applications Adopting lean product development in new production system introduction process for sustainable operational performance Advances and emerging research trends in maritime transport logistics: environment, port competitiveness and foreign trade A requirement-driven approach for competency-based collaboration in industrial data science projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1