PERENCANAAN PENJADWALAN TENAGA KERJA PADA UKM SONGKOK IKAT KEPALA

Welly Bachtria Nugroho
{"title":"PERENCANAAN PENJADWALAN TENAGA KERJA PADA UKM SONGKOK IKAT KEPALA","authors":"Welly Bachtria Nugroho","doi":"10.22219/jmb.v8i2.7065","DOIUrl":null,"url":null,"abstract":"Songkok Ikat Kepala was one of UKM which produce songkok in Gresik. This UKM Songkok Ikat Kepala was produced by strategy “make to order” and there was no guideline for period production. Problems that occurred were known asdelayed production process at the process of sewing. The aim of this study was (1) to analyze the planning of labor scheduling and (2) to determine the standard of estimation of item production process. The data were analyzed by using period study and gantt diagram techniques. The results of the study showed that there were 2 standards of estimation, those are fast and low standards. Fast standard needed the work estimation in 444 seconds. However, low standard needed the work estimation in 536 seconds. Therefore, this study was expected to be guidance to arrange the schedule by using gantt diagram. ","PeriodicalId":33544,"journal":{"name":"Manajemen Bisnis","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manajemen Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22219/jmb.v8i2.7065","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Songkok Ikat Kepala was one of UKM which produce songkok in Gresik. This UKM Songkok Ikat Kepala was produced by strategy “make to order” and there was no guideline for period production. Problems that occurred were known asdelayed production process at the process of sewing. The aim of this study was (1) to analyze the planning of labor scheduling and (2) to determine the standard of estimation of item production process. The data were analyzed by using period study and gantt diagram techniques. The results of the study showed that there were 2 standards of estimation, those are fast and low standards. Fast standard needed the work estimation in 444 seconds. However, low standard needed the work estimation in 536 seconds. Therefore, this study was expected to be guidance to arrange the schedule by using gantt diagram. 
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
旺角角人力安排工作
Songkok Ikat Kepala是Gresik生产Songkok的UKM之一。这款UKM Songkok Ikat Kepala是按照“订制”的策略生产的,没有周期生产的指导方针。发生的问题被称为缝制过程中的生产过程延迟。本研究的目的是:(1)分析劳动调度计划;(2)确定项目生产过程的估计标准。采用周期研究和甘特图技术对数据进行分析。研究结果表明,有两种估计标准,即快速标准和低标准。快速标准需要在444秒内完成功估算。然而,低标准需要在536秒内完成工作估算。因此,本研究希望能对使用甘特图来安排日程提供指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
期刊最新文献
The Effectiveness of Training and Development On Employee Performance to Enhance Competitive Advantage: A Case Study of Social Enterprise Development Sierra Leone (Send-Sl) The Effect of Ethical Climate on Employee Performance Mediated by Communication at PT. Pos Indonesia Malang The Role of Internal Audit Quality to the Sustainability and Success of Microfinance Program Increasing the Competitive Advantage of MSMEs in the COVID-19 Pandemic Era by Implementing the Blue Ocean Strategy How Does Scarcity Promotion Lead To Impulse Purchase in Digital Market?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1