The Relationship Between Interest and Liquidated Damages in Construction Contracts

Z. Shi
{"title":"The Relationship Between Interest and Liquidated Damages in Construction Contracts","authors":"Z. Shi","doi":"10.5539/ass.v19n4p70","DOIUrl":null,"url":null,"abstract":"There are certain differences in practice regarding whether the contractor of a construction project construction contract can claim both the contractual or statutory interest and liquidated damages from the employer. From the origin and essence of interest, it can be known that it is a part of the \"proceeds\" obtained by the lender according to the contract. As long as the delayed payment behavior exists, interest becomes the property that the right holder will inevitably lose. The consequences of the aforementioned \"loss\" have a direct causal relationship with the debtor's breach of contract and there is no difference due to the construction project or contract. As far as liquidated damages are concerned, they are also a form of liability for breach of contract, with the main purpose of compensating for the losses of the observant party. It is not inappropriate to classify the interest lost by the right holder as a loss under the scope of liability for breach of contract. The basic legal relationship between the employer and the contractor arising from the construction of the project is a contract of contract, not a loan contract. As for the outstanding project funds of the employer, it undoubtedly belongs to the category of overdue payments that are payable but not paid.","PeriodicalId":89741,"journal":{"name":"Asian social science","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian social science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5539/ass.v19n4p70","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

There are certain differences in practice regarding whether the contractor of a construction project construction contract can claim both the contractual or statutory interest and liquidated damages from the employer. From the origin and essence of interest, it can be known that it is a part of the "proceeds" obtained by the lender according to the contract. As long as the delayed payment behavior exists, interest becomes the property that the right holder will inevitably lose. The consequences of the aforementioned "loss" have a direct causal relationship with the debtor's breach of contract and there is no difference due to the construction project or contract. As far as liquidated damages are concerned, they are also a form of liability for breach of contract, with the main purpose of compensating for the losses of the observant party. It is not inappropriate to classify the interest lost by the right holder as a loss under the scope of liability for breach of contract. The basic legal relationship between the employer and the contractor arising from the construction of the project is a contract of contract, not a loan contract. As for the outstanding project funds of the employer, it undoubtedly belongs to the category of overdue payments that are payable but not paid.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建设合同中利息与违约金的关系
建设工程施工合同的承包人是否可以向发包人主张合同利益、法定利益和违约赔偿金,在实践中存在一定差异。从利息的来源和本质可知,它是贷款人根据合同获得的“收益”的一部分。只要延期支付行为存在,利息就成为权利人必然会失去的财产。前述“损失”的后果与债务人违约有直接因果关系,不存在因建设工程或合同而产生的差异。就违约金而言,违约金也是违约责任的一种形式,主要目的是赔偿守约方的损失。将权利人损失的利息归为违约责任范围内的损失并无不妥。发包人与承包人之间因工程建设产生的基本法律关系是承包合同,而不是借款合同。至于发包人的工程款,无疑属于应付款而不付款的逾期付款范畴。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Study on the Correlation Between the Participation of Flipped Classroom and the Pleasure and Boredom of Non-English Majors in Foreign Language Classroom Evaluation of Sustainable Strategic Value of Clothing Brand Based on Maxdiff Factors Impacting Employment Opportunities and Outcomes for Individuals with Disabilities in Nepal Unifying Historical-Research and Drama-Interpretation: A Methodological Exploration of Textile Historical Materials in Chinese Classical Dramatic Literature Adaptation Strategies Through Mining Compensation in Mabayi Commune, Burundi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1