{"title":"An analytical study of critical factors affecting contractor efficiency in construction projects in Indian scenario","authors":"S. Deep, Laura Simon, M. Asim, A. Rahimzadeh, Sulala Al-Hamdani","doi":"10.2478/otmcj-2018-0010","DOIUrl":null,"url":null,"abstract":"Abstract Purpose Recent studies show that lowest bidder technique is mainly used in developing countries such as India to award a contract. It has been demonstrated that the lowest bid is not always the accurate one and can lead to cost overruns and time extensions amongst other problems. The aim of this study was to investigate the critical factors impacting contractor’s efficiency in Indian construction projects. Research approach A survey was sent to participants of construction projects awarded by the government with the lowest bidder technique in Uttar Pradesh, India. For further research, snowball sampling was used, and structured interviews were conducted amongst experienced managers and engineers of these projects on both client’s and contractor’s side. Findings It was observed that, to a greater extent, the delays were caused due to contractor’s opportunistic behaviour. The main findings are that new bidding methodologies are to be tested as they can lead to the choice of a more accurate and realistic bidder. In addition, subjective evaluation components, such as schedule and work-force, should be reflected in contract award methods in addition to the cost criteria. Further studies should be performed on the choice of contract awarding methodology based on the project size and type. Originality value The researcher’s focus was to analyze the influence of contracting methodologies and factors affecting contractor’s performance in lowest bid award project, where this is an area of least focus amongst researchers in the Indian subcontinent.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1794 - 1802"},"PeriodicalIF":1.6000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.2478/otmcj-2018-0010","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2018-0010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 5

Abstract

Abstract Purpose Recent studies show that lowest bidder technique is mainly used in developing countries such as India to award a contract. It has been demonstrated that the lowest bid is not always the accurate one and can lead to cost overruns and time extensions amongst other problems. The aim of this study was to investigate the critical factors impacting contractor’s efficiency in Indian construction projects. Research approach A survey was sent to participants of construction projects awarded by the government with the lowest bidder technique in Uttar Pradesh, India. For further research, snowball sampling was used, and structured interviews were conducted amongst experienced managers and engineers of these projects on both client’s and contractor’s side. Findings It was observed that, to a greater extent, the delays were caused due to contractor’s opportunistic behaviour. The main findings are that new bidding methodologies are to be tested as they can lead to the choice of a more accurate and realistic bidder. In addition, subjective evaluation components, such as schedule and work-force, should be reflected in contract award methods in addition to the cost criteria. Further studies should be performed on the choice of contract awarding methodology based on the project size and type. Originality value The researcher’s focus was to analyze the influence of contracting methodologies and factors affecting contractor’s performance in lowest bid award project, where this is an area of least focus amongst researchers in the Indian subcontinent.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印度情景下影响建筑项目承包商效率的关键因素分析研究
摘要目的近年来的研究表明,在印度等发展中国家,最低投标人技术主要用于合同授予。事实证明,最低报价并不总是准确的,并可能导致成本超支和时间延长等问题。本研究的目的是探讨影响印度建筑项目承包商效率的关键因素。研究方法:在印度北方邦,对政府以最低投标技术授予的建设项目的参与者进行了调查。为了进一步的研究,我们使用了滚雪球抽样,并对这些项目的经验丰富的经理和工程师进行了结构化访谈,包括客户和承包商方面。据观察,延误在很大程度上是由于承包商的投机行为造成的。主要发现是,新的投标方法有待检验,因为它们可以导致选择一个更准确、更现实的投标人。此外,除了费用标准外,还应在合同授予方法中反映主观评价部分,例如进度和劳动力。应根据项目的规模和类型,进一步研究选择授予合同的方法。研究人员的重点是分析承包方法的影响和影响承包商在最低出价奖励项目中的表现的因素,这是印度次大陆研究人员最不关注的领域。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1