SIMULATION MODELS OF TECHNOLOGICAL OPERATIONS IN MACHINE MILKING IN PARALLEL TYPE PARLOUR

IF 0.6 Q4 AGRICULTURAL ENGINEERING INMATEH-Agricultural Engineering Pub Date : 2023-08-17 DOI:10.35633/inmateh-70-40
Dimitar Georgiev, G. Dineva, D. Karastoyanov, K. Peychev, Vania Dimova
{"title":"SIMULATION MODELS OF TECHNOLOGICAL OPERATIONS IN MACHINE MILKING IN PARALLEL TYPE PARLOUR","authors":"Dimitar Georgiev, G. Dineva, D. Karastoyanov, K. Peychev, Vania Dimova","doi":"10.35633/inmateh-70-40","DOIUrl":null,"url":null,"abstract":"The hourly productivity of the milking parlour is significantly influenced by the organization of the technological process. Milkers perform a series of sequential operations (entry on the platforms, washing, drying, placing the milking units, removing them, disinfecting the teats, exiting the platforms of the milking parlour) the duration of which is a large part of the total milking time. The duration of the latent period from the release of oxytocin to its contact with the myoepithelial cells in the glandular part of the udder is from 30 s to 90 s (average 60 s). In this line of thought, the following questions arise: \"in what time interval should the preparatory operations for milking be performed and what is their permissible duration\". The aim of the present study is to develop methodologies (models) for simulating the work of milkers in \"Parallel\" type parlours. It was found that under the initially set working conditions of only two milkers in the milking parlour, all developed models are applicable for capacities up to 2x8. Models II, III and IV are unacceptable for capacities above 2x8, as the total duration of preparation of milking cows exceeds the time frame by between 30-80%. This finding proves that for a capacity over 2x8 it is necessary to perform technological operations with a larger number of milkers.","PeriodicalId":44197,"journal":{"name":"INMATEH-Agricultural Engineering","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2023-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INMATEH-Agricultural Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35633/inmateh-70-40","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"AGRICULTURAL ENGINEERING","Score":null,"Total":0}
引用次数: 0

Abstract

The hourly productivity of the milking parlour is significantly influenced by the organization of the technological process. Milkers perform a series of sequential operations (entry on the platforms, washing, drying, placing the milking units, removing them, disinfecting the teats, exiting the platforms of the milking parlour) the duration of which is a large part of the total milking time. The duration of the latent period from the release of oxytocin to its contact with the myoepithelial cells in the glandular part of the udder is from 30 s to 90 s (average 60 s). In this line of thought, the following questions arise: "in what time interval should the preparatory operations for milking be performed and what is their permissible duration". The aim of the present study is to develop methodologies (models) for simulating the work of milkers in "Parallel" type parlours. It was found that under the initially set working conditions of only two milkers in the milking parlour, all developed models are applicable for capacities up to 2x8. Models II, III and IV are unacceptable for capacities above 2x8, as the total duration of preparation of milking cows exceeds the time frame by between 30-80%. This finding proves that for a capacity over 2x8 it is necessary to perform technological operations with a larger number of milkers.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
并联式挤奶机工艺操作的仿真模型
挤奶室的小时生产率受到工艺流程组织的显著影响。挤奶工人进行一系列连续的操作(进入挤奶平台,清洗,干燥,放置挤奶设备,取出挤奶设备,对奶嘴消毒,离开挤奶室的平台),这些操作的持续时间占挤奶总时间的很大一部分。从催产素释放到与乳房腺部肌上皮细胞接触的潜伏期为30秒至90秒(平均60秒)。在这种思路下,出现了以下问题:“挤奶的准备操作应该在什么时间间隔进行?它们的允许持续时间是多长?”本研究的目的是开发方法(模型)来模拟挤奶工人在“平行”型客厅的工作。研究发现,在最初设定的挤奶室只有两个挤奶工的工作条件下,所有开发的模型都适用于2x8的容量。模型II、III和IV对于超过2x8的产能是不可接受的,因为准备奶牛的总时间超过了时间框架30-80%。这一发现证明,对于超过2x8的产能,有必要使用更多的挤奶器进行技术操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
INMATEH-Agricultural Engineering
INMATEH-Agricultural Engineering AGRICULTURAL ENGINEERING-
CiteScore
1.30
自引率
57.10%
发文量
98
期刊最新文献
TECHNICAL AND ENVIRONMENTAL EVALUATION OF USING RICE HUSKS AND SOLAR ENERGY ON THE ACTIVATION OF ABSORPTION CHILLERS IN THE CARIBBEAN REGION. CASE STUDY: BARRANQUILLA ALGORITHM FOR OPTIMIZING THE MOVEMENT OF A MOUNTED MACHINETRACTOR UNIT IN THE HEADLAND OF AN IRREGULARLY SHAPED FIELD STUDY ON THE INFLUENCE OF PCA PRE-TREATMENT ON PIG FACE IDENTIFICATION WITH KNN IoT-BASED EVAPOTRANSPIRATION ESTIMATION OF PEANUT PLANT USING DEEP NEURAL NETWORK DESIGN AND EXPERIMENT OF A SINGLE-ROW SMALL GRAIN PRECISION SEEDER
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1