{"title":"Project of Micro-hydroelectric Power Generation System – Case study","authors":"Wes Grebski, M. Grebski","doi":"10.30657/pea.2022.28.21","DOIUrl":null,"url":null,"abstract":"Abstract The article describes a student project of installing a micropower generation system utilizing energy from the water drained from underground coalmines. The paper contains a description of the site which is a manmade phenomenon from the anthracite mining era. The project described in the article was completed as part of the project-based learning curriculum. Students had the opportunity to work on a team and apply theoretical knowledge learned in individual courses as part of the engineering curriculum. The article also focuses on the calculation of the potential power capacity to a proposed hydropower generation system. The proposed micro-hydro system is harvesting the potential and kinetic energy of the water discharged from the water-draining tunnel. A commercially available micro-hydro turbine combined with an electric power generator was adapted for this purpose. The article also includes an analysis of the profitability of the project and the time of return on investment. The calculations are based on the current price of electricity (2021), depreciation schedule and present tax incentives (2021) to generate electricity from renewable sources. The article also includes some lessons learned from the project as well as the recommendations for future projects.","PeriodicalId":36269,"journal":{"name":"Production Engineering Archives","volume":"28 1","pages":"178 - 184"},"PeriodicalIF":1.9000,"publicationDate":"2022-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Engineering Archives","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30657/pea.2022.28.21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract The article describes a student project of installing a micropower generation system utilizing energy from the water drained from underground coalmines. The paper contains a description of the site which is a manmade phenomenon from the anthracite mining era. The project described in the article was completed as part of the project-based learning curriculum. Students had the opportunity to work on a team and apply theoretical knowledge learned in individual courses as part of the engineering curriculum. The article also focuses on the calculation of the potential power capacity to a proposed hydropower generation system. The proposed micro-hydro system is harvesting the potential and kinetic energy of the water discharged from the water-draining tunnel. A commercially available micro-hydro turbine combined with an electric power generator was adapted for this purpose. The article also includes an analysis of the profitability of the project and the time of return on investment. The calculations are based on the current price of electricity (2021), depreciation schedule and present tax incentives (2021) to generate electricity from renewable sources. The article also includes some lessons learned from the project as well as the recommendations for future projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
微型水力发电系统工程-案例研究
文章描述了一个利用地下煤矿排水中的能量安装微型发电系统的学生项目。本文对该遗址进行了描述,这是无烟煤开采时代的一种人造现象。文章中描述的项目是作为基于项目的学习课程的一部分完成的。学生们有机会与团队合作,并将在个别课程中学习到的理论知识作为工程课程的一部分。本文还重点计算了拟建水电发电系统的潜在发电量。拟建的微型水力系统正在收集排水隧道排出的水的势能和动能。商业上可买到的微型水轮机与发电机结合用于此目的。文章还分析了该项目的盈利能力和投资回报时间。这些计算基于当前电价(2021年)、折旧时间表和当前可再生能源发电税收优惠(2021)。文章还包括从该项目中吸取的一些经验教训以及对未来项目的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Production Engineering Archives
Production Engineering Archives Engineering-Industrial and Manufacturing Engineering
CiteScore
6.10
自引率
13.00%
发文量
50
审稿时长
6 weeks
期刊最新文献
Shallot Price Forecasting Models: Comparison among Various Techniques Framework for Increasing Eco-efficiency in the Tofu Production Process: Circular Economy Approach Diagnostic methods and ways of testing the workability of coal - a review Company Cybersecurity System: Assessment, Risks and Expectations Experimental-numerical analysis of the fracture process in smooth and notched V specimens
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1