Complex estimation of geotechnical risks in mine and underground construction

E. Kulikova, S. Balovtsev, O. Skopintseva
{"title":"Complex estimation of geotechnical risks in mine and underground construction","authors":"E. Kulikova, S. Balovtsev, O. Skopintseva","doi":"10.21177/1998-4502-2023-15-1-7-16","DOIUrl":null,"url":null,"abstract":"Introduction. Projects for the construction of underground structures and mines often involve significant geotechnical risks. The uncertainty associated with geotechnical conditions implies the development of a specific approach to making design and constructive decisions. Even after a thorough geotechnical study, the ability to accurately predict the behavior of adjacent rock massif is often difficult due to the large number of engineering-geological and hydro-geological variables. Most of the identified risks can be eliminated at the design stage. Residual risks should be subjected to a comprehensive assessment, including qualitative and quantitative analysis and calculations of damage from potential risk and technical and economic efficiency of the adopted design decision. Objective. Complex estimation of geotechnical risks in mine and underground construction based on the analysis of indicators of the implementation of accidents by mining-geological and mining-technical factors, taking into account the use of special methods of construction. Methodology. A сomplex estimation of geotechnical risks was carried out on the basis of the theory of emergency risk using methods of mathematical statistics, probability theory; the method of expert assessments to obtain the values of vulnerability coefficients of the applied technologies of mine and underground construction. The developed methodology includes several stages. At the first stage of a сomplex risk estimation, it is necessary to rank the geotechnical risk factors selected for analysis, for which a concordance coefficient is introduced. When analyzing each of the emerging geotechnical figures during the construction of a specific underground or mine construction facility, one of the defining indicators is the numerical expression of the potential damage from the occurrence of an emergency situation, which represents the percentage ratio of the excess of the construction period in real practice to the same indicator laid down in the project, or the ratio of the increase in the cost of construction to the estimated cost. Next, the numerical value of each type of risk is determined and a scale of numerical values of risks is compiled, on the basis of which decisions are made on the management of each specific risk. At the end, the vulnerability of a mine or underground construction facility under construction is determined, i.e. the degree of its possible damage and destruction when exposed to abnormal situations of a natural and man-made nature. Results and discussion. A methodology has been developed for the сomplex estimation of geotechnical risk in mine and underground construction based on the ranking of risks according to the degree of vulnerability of the technologies used. Ranking of construction objects by their vulnerability to various impacts allows us to assess the correlation between the values of the parameters and the qualitative characteristics of the elements of the “mining – rock mass – construction technology” system and the factors that lead to the development of potential damage. In the course of the research, a generalized indicator of the predicted geotechnical risk was identified, which allows taking into account the impact of construction methods on the risk. Since mine workings are currently being built mainly in complex hydro-geological and engineering-geological conditions, the calculation of the generalized indicator focuses on the use of special construction methods, which required the introduction of correction factors to calculate the indicator of the predicted geotechnical risk. The values of correction coefficients for the most used special methods were obtained by the method of expert assessments. Conclusions. One of the important aspects of a сomplex estimation of geotechnical risks in mine and underground construction is to determine the vulnerability of the “mining - rock mass – technology” system. Vulnerability depends on the location of the mine, its cross-section, engineering-geological and hydro-geological conditions, mode of operation, reliability of load-bearing and fencing, etc. By the method of сomplex estimation, vulnerability coefficients of underground structures under construction and mine workings were obtained, as well as correction coefficients taking into account the construction method.","PeriodicalId":37608,"journal":{"name":"Sustainable Development of Mountain Territories","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Development of Mountain Territories","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21177/1998-4502-2023-15-1-7-16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 5

Abstract

Introduction. Projects for the construction of underground structures and mines often involve significant geotechnical risks. The uncertainty associated with geotechnical conditions implies the development of a specific approach to making design and constructive decisions. Even after a thorough geotechnical study, the ability to accurately predict the behavior of adjacent rock massif is often difficult due to the large number of engineering-geological and hydro-geological variables. Most of the identified risks can be eliminated at the design stage. Residual risks should be subjected to a comprehensive assessment, including qualitative and quantitative analysis and calculations of damage from potential risk and technical and economic efficiency of the adopted design decision. Objective. Complex estimation of geotechnical risks in mine and underground construction based on the analysis of indicators of the implementation of accidents by mining-geological and mining-technical factors, taking into account the use of special methods of construction. Methodology. A сomplex estimation of geotechnical risks was carried out on the basis of the theory of emergency risk using methods of mathematical statistics, probability theory; the method of expert assessments to obtain the values of vulnerability coefficients of the applied technologies of mine and underground construction. The developed methodology includes several stages. At the first stage of a сomplex risk estimation, it is necessary to rank the geotechnical risk factors selected for analysis, for which a concordance coefficient is introduced. When analyzing each of the emerging geotechnical figures during the construction of a specific underground or mine construction facility, one of the defining indicators is the numerical expression of the potential damage from the occurrence of an emergency situation, which represents the percentage ratio of the excess of the construction period in real practice to the same indicator laid down in the project, or the ratio of the increase in the cost of construction to the estimated cost. Next, the numerical value of each type of risk is determined and a scale of numerical values of risks is compiled, on the basis of which decisions are made on the management of each specific risk. At the end, the vulnerability of a mine or underground construction facility under construction is determined, i.e. the degree of its possible damage and destruction when exposed to abnormal situations of a natural and man-made nature. Results and discussion. A methodology has been developed for the сomplex estimation of geotechnical risk in mine and underground construction based on the ranking of risks according to the degree of vulnerability of the technologies used. Ranking of construction objects by their vulnerability to various impacts allows us to assess the correlation between the values of the parameters and the qualitative characteristics of the elements of the “mining – rock mass – construction technology” system and the factors that lead to the development of potential damage. In the course of the research, a generalized indicator of the predicted geotechnical risk was identified, which allows taking into account the impact of construction methods on the risk. Since mine workings are currently being built mainly in complex hydro-geological and engineering-geological conditions, the calculation of the generalized indicator focuses on the use of special construction methods, which required the introduction of correction factors to calculate the indicator of the predicted geotechnical risk. The values of correction coefficients for the most used special methods were obtained by the method of expert assessments. Conclusions. One of the important aspects of a сomplex estimation of geotechnical risks in mine and underground construction is to determine the vulnerability of the “mining - rock mass – technology” system. Vulnerability depends on the location of the mine, its cross-section, engineering-geological and hydro-geological conditions, mode of operation, reliability of load-bearing and fencing, etc. By the method of сomplex estimation, vulnerability coefficients of underground structures under construction and mine workings were obtained, as well as correction coefficients taking into account the construction method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
矿山和地下施工中岩土工程风险的复杂估计
介绍。地下结构和矿山的建设项目往往涉及重大的岩土工程风险。与岩土条件相关的不确定性意味着开发一种特定的方法来进行设计和施工决策。即使经过彻底的岩土工程研究,由于大量的工程地质和水文地质变量,准确预测邻近岩体的行为往往是困难的。大多数确定的风险可以在设计阶段消除。剩余风险应进行综合评估,包括定性和定量分析和计算潜在风险的损害以及所采用的设计决策的技术和经济效率。目标。在分析矿山地质和矿山技术事故实施指标的基础上,综合考虑特殊施工方法的使用,对矿山和地下工程施工中的复杂岩土风险进行评估。方法。在应急风险理论的基础上,运用数理统计、概率论等方法对岩土工程风险进行了综合评估;采用专家评价的方法获得矿山和地下建筑应用技术的脆弱性系数值。开发的方法包括几个阶段。在复杂风险评估的第一阶段,需要对选择分析的岩土工程风险因素进行排序,并引入一致性系数。在分析具体的地下或矿山建设设施建设过程中出现的每一个岩土工程数字时,其中一个定义指标是紧急情况发生时潜在损害的数值表达,它表示实际超过工期与项目中规定的同一指标的百分比比率,或施工成本增加与预计成本的比率。其次,确定各类风险的数值,编制风险数值量表,在此基础上对各具体风险的管理作出决策。最后,确定正在建设的矿山或地下建筑设施的脆弱性,即在遇到自然和人为的异常情况时,其可能受到的破坏和破坏程度。结果和讨论。根据所使用的技术的脆弱性程度对风险进行排序,开发了一种对矿山和地下建筑岩土工程风险进行复杂估计的方法。根据施工对象对各种影响的脆弱性进行排序,使我们能够评估参数值与“采矿-岩体-施工技术”系统要素的定性特征以及导致潜在损害发展的因素之间的相关性。在研究过程中,确定了预测岩土工程风险的广义指标,该指标允许考虑施工方法对风险的影响。由于目前矿山主要建设在复杂的水文地质和工程地质条件下,广义指标的计算侧重于采用特殊的施工方法,这就需要引入修正因子来计算预测岩土风险指标。采用专家评价法对最常用的特殊方法进行了修正系数的取值。结论。矿山和地下工程复杂岩土风险评估的一个重要方面是确定“采矿-岩体-技术”系统的脆弱性。易损性取决于矿井的位置、断面、工程地质和水文地质条件、作业方式、承重和围栏的可靠性等。利用复合估算法,得到了地下结构在施工和矿山作业的易损性系数,以及考虑施工方法的修正系数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Sustainable Development of Mountain Territories
Sustainable Development of Mountain Territories Social Sciences-Sociology and Political Science
CiteScore
2.40
自引率
0.00%
发文量
36
期刊介绍: International scientific journal "Sustainable development of mountain territories" covers fundamental and applied regional, national and international research and provides a platform to publish original full papers and related reviews in the following areas: engineering science and Earth science in the field of sustainable development of mountain territories. Main objectives of international scientific journal "Sustainable development of mountain territories" are: raising the level of professional scientific workers, teachers of higher educational institutions and scientific organizations; presentation of research results in the field of sustainable development of mountain areas on the technical aspects and Earth sciences, informing readers about the results of Russian and international scientific forums; improved review and editing of the articles submitted for publication; ensuring wide dissemination for the published articles in the international academic environment; encouraging dissemination and indexing of scientific works in various foreign key citation databases.
期刊最新文献
Socio-economic initiative in the sustainable development of Ural Cities Determination of parameters of elastic damping devices in mining shovel mechanisms Modeling and control of parameters of flow technologies with local hydraulic transport and coal dewatering based on analysis of the structure of the tunneling cycle Analysis of the nanoparticles formation mechanisms in the rock mass Assessment of the current state of the hydrochemical regime and water-environmental problems of the basin of the Gavaraget River flowing into Lake Sevan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1