Risk Analysis of Transport Requalification Projects in the Urban Mobility Problem Caused by a Mining Disaster

IF 3.6 Q2 MANAGEMENT Logistics-Basel Pub Date : 2023-09-04 DOI:10.3390/logistics7030058
M. E. Fontana, N. Levino, José Leão, Patrícia Guarnieri, Emerson Philipe Sinesio
{"title":"Risk Analysis of Transport Requalification Projects in the Urban Mobility Problem Caused by a Mining Disaster","authors":"M. E. Fontana, N. Levino, José Leão, Patrícia Guarnieri, Emerson Philipe Sinesio","doi":"10.3390/logistics7030058","DOIUrl":null,"url":null,"abstract":"Background: This paper proposes a risk analysis of transport requalification projects in the urban mobility problem caused by a mining disaster related to irregular rock salt extraction in the city of Maceió, Brazil. Methods: The model is composed of three main steps: problem definition, risk management, and decision analysis. For this purpose, we used the Picture Fuzzy-Delphi method for data collection and experts’ judgment elicitation and the Delphi method was used to assess the problem without interference from others. In addition, we used Picture Fuzzy Sets (PFSs) to incorporate uncertain information in the decision-making process. Results: The results of the proposed model demonstrated consistency and relevance to the discussion. The application of methods shows the risks of the project based on a general perspective. It evaluates the sustainability tripod: economic, environmental, and social points of view, assessing the occurrence risk and intensity of the risk. Conclusions: The main objective of the work was achieved; however, some limitations of this study are related to the methods used to assess risks and the options of projects of requalification available at the moment of data analysis. This paper contributes because it systematizes the risk management of projects related to requalification in urban mobility.","PeriodicalId":56264,"journal":{"name":"Logistics-Basel","volume":null,"pages":null},"PeriodicalIF":3.6000,"publicationDate":"2023-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Logistics-Basel","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/logistics7030058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

Background: This paper proposes a risk analysis of transport requalification projects in the urban mobility problem caused by a mining disaster related to irregular rock salt extraction in the city of Maceió, Brazil. Methods: The model is composed of three main steps: problem definition, risk management, and decision analysis. For this purpose, we used the Picture Fuzzy-Delphi method for data collection and experts’ judgment elicitation and the Delphi method was used to assess the problem without interference from others. In addition, we used Picture Fuzzy Sets (PFSs) to incorporate uncertain information in the decision-making process. Results: The results of the proposed model demonstrated consistency and relevance to the discussion. The application of methods shows the risks of the project based on a general perspective. It evaluates the sustainability tripod: economic, environmental, and social points of view, assessing the occurrence risk and intensity of the risk. Conclusions: The main objective of the work was achieved; however, some limitations of this study are related to the methods used to assess risks and the options of projects of requalification available at the moment of data analysis. This paper contributes because it systematizes the risk management of projects related to requalification in urban mobility.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
矿难引发的城市交通问题中交通资质项目的风险分析
背景:本文针对巴西Maceió市因不规则岩盐开采引起的矿难引发的城市交通问题,提出了交通再认证项目的风险分析。方法:该模型由问题定义、风险管理和决策分析三个主要步骤组成。为此,我们采用图片模糊-德尔菲法进行数据收集和专家判断的启发,并采用德尔菲法在不受他人干扰的情况下对问题进行评估。此外,我们使用图像模糊集(pfs)在决策过程中纳入不确定信息。结果:提出的模型的结果显示一致性和相关性的讨论。方法的应用显示了基于一般视角的项目风险。它从经济、环境和社会三个角度评估可持续性,评估发生风险和风险强度。结论:达到了工作的主要目的;然而,本研究的一些局限性与用于评估风险的方法和在数据分析时可用的再资格项目的选择有关。本文的贡献在于,它将城市交通再认证相关项目的风险管理系统化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Logistics-Basel
Logistics-Basel Multiple-
CiteScore
6.60
自引率
0.00%
发文量
0
审稿时长
11 weeks
期刊最新文献
Current State and Future of International Logistics Networks—The Role of Digitalization and Sustainability in a Globalized World An Innovative Framework for Quality Assurance in Logistics Packaging Dynamic Capabilities and Digital Transformation in the COVID-19 Era: Implications from Driving Schools A Systematic Literature Review on the Application of Automation in Logistics Climate Justice Implications of Banning Air-Freighted Fresh Produce
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1