Shared mental models in multi-team systems: improving enterprise system implementation

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS ACS Applied Bio Materials Pub Date : 2023-02-27 DOI:10.1108/ijmpb-05-2022-0119
X. Wu, Randi Jiang, J. C. Tsai, G. Klein
{"title":"Shared mental models in multi-team systems: improving enterprise system implementation","authors":"X. Wu, Randi Jiang, J. C. Tsai, G. Klein","doi":"10.1108/ijmpb-05-2022-0119","DOIUrl":null,"url":null,"abstract":"PurposeAn enterprise system (ES) implementation proceeds as a multi-team system (MTS), with multiple project teams spanning time and business functions to meet organization-wide goals. Thus, the focus shifts from the output of a single project team to the outcomes of all ES project teams as part of the larger MTS. This study extends concepts of shared mental models (SMMs) in aspects of goals and plans in both MTS level and project team level and further examines SMMs' interactive impact on the MTS-based project performance.Design/methodology/approachThis study tests the model with survey data from 140 MTS-based ES implementations in China. Partial Least Squares Structural Equation Modeling (PLS SEM) served to test the hypothesized relationships.FindingsSMMs of project team-level goals and plans contribute to the cooperation and coordination in the ES implementation and thereby improve final implementation efficiency either directly or in combination. However, SMMs of MTS-level goal and plans contribute integration only when considered with achievements at the project level.Originality/valuePrior literature suggests a critical role of integration among ES project teams but finds challenges in achieving such integration. By leveraging shared mental model theory, the authors' results show that both common goal and plan understandings in the integration team critically influence integration in ES implementation and, thus, the final ES implementation efficiency, though not in a strictly linear relationship.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2023-02-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-05-2022-0119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 1

Abstract

PurposeAn enterprise system (ES) implementation proceeds as a multi-team system (MTS), with multiple project teams spanning time and business functions to meet organization-wide goals. Thus, the focus shifts from the output of a single project team to the outcomes of all ES project teams as part of the larger MTS. This study extends concepts of shared mental models (SMMs) in aspects of goals and plans in both MTS level and project team level and further examines SMMs' interactive impact on the MTS-based project performance.Design/methodology/approachThis study tests the model with survey data from 140 MTS-based ES implementations in China. Partial Least Squares Structural Equation Modeling (PLS SEM) served to test the hypothesized relationships.FindingsSMMs of project team-level goals and plans contribute to the cooperation and coordination in the ES implementation and thereby improve final implementation efficiency either directly or in combination. However, SMMs of MTS-level goal and plans contribute integration only when considered with achievements at the project level.Originality/valuePrior literature suggests a critical role of integration among ES project teams but finds challenges in achieving such integration. By leveraging shared mental model theory, the authors' results show that both common goal and plan understandings in the integration team critically influence integration in ES implementation and, thus, the final ES implementation efficiency, though not in a strictly linear relationship.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
多团队系统中的共享心智模型:改进企业系统实现
目的企业系统(ES)的实施是作为一个多团队系统(MTS)进行的,多个项目团队跨越时间和业务功能来实现组织范围的目标。因此,重点从单个项目团队的产出转移到作为更大MTS一部分的所有ES项目团队的成果。本研究在MTS层面和项目团队层面的目标和计划方面扩展了共享心理模型(SMM)的概念,并进一步考察了SMM对基于MTS的项目绩效的互动影响。设计/方法/方法本研究使用来自中国140个基于MTS的ES实施的调查数据来测试该模型。偏最小二乘结构方程建模(PLS SEM)用于检验假设的关系。项目团队层面目标和计划的发现有助于ES实施中的合作与协调,从而直接或组合提高最终实施效率。然而,MTS级别目标和计划的SMM只有在考虑到项目级别的成就时才有助于整合。独创性/价值先前的文献表明,ES项目团队之间的整合具有关键作用,但在实现这种整合方面存在挑战。通过利用共享心理模型理论,作者的研究结果表明,集成团队中的共同目标和计划理解都会严重影响ES实施中的集成,从而影响最终的ES实施效率,尽管不是严格的线性关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1