Investigation of Price Escalation and Its Mitigation Mechanisms on Selected Building Construction Projects of Jimma University

IF 1 Q4 ENGINEERING, CIVIL Jordan Journal of Civil Engineering Pub Date : 2023-04-01 DOI:10.14525/jjce.v17i2.03
Hamelmal Mekonen, Alemu Mosisa Legesse, Frikot Mulatu Ameya
{"title":"Investigation of Price Escalation and Its Mitigation Mechanisms on Selected Building Construction Projects of Jimma University","authors":"Hamelmal Mekonen, Alemu Mosisa Legesse, Frikot Mulatu Ameya","doi":"10.14525/jjce.v17i2.03","DOIUrl":null,"url":null,"abstract":"Fee escalation in construction refers to a boom in the price of an item inside the preliminary agreement or the bottom cost of an undertaking. racking production mission fees must be an ongoing procedure that must always be carried out on all projects, because the reasons for which the price will increase vary from project to project and due to the construction segment. The motive of this observation was to assess fee escalation, escalation factors and mitigation mechanisms in deciding on construction initiatives. From February 1 to 30, 2020, a questionnaire was administered to twelve workers and interviews with seven key informants were conducted for an in-depth look at four selected Jimma University construction projects, which were project A to project D. Relative importance index values were generated and ranked for the elements affecting fee escalation to see their relative significance. It was found that there has been a moderate degree of charge increase within the initiatives studied, from 12% to 21%. The mitigation modalities observed with the aid of the projects, particularly inserting escalation clauses in contractual agreements, making changes requiring funding and increasing time limits, seem to be inadequate, as they do not provide a foundation for choices and remedy of disputes instead of mitigating the escalation of tasks starting from 3.21% to 12%. KEYWORDS: Escalation, Mitigation, Price, Construction projects.","PeriodicalId":51814,"journal":{"name":"Jordan Journal of Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2023-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jordan Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14525/jjce.v17i2.03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Fee escalation in construction refers to a boom in the price of an item inside the preliminary agreement or the bottom cost of an undertaking. racking production mission fees must be an ongoing procedure that must always be carried out on all projects, because the reasons for which the price will increase vary from project to project and due to the construction segment. The motive of this observation was to assess fee escalation, escalation factors and mitigation mechanisms in deciding on construction initiatives. From February 1 to 30, 2020, a questionnaire was administered to twelve workers and interviews with seven key informants were conducted for an in-depth look at four selected Jimma University construction projects, which were project A to project D. Relative importance index values were generated and ranked for the elements affecting fee escalation to see their relative significance. It was found that there has been a moderate degree of charge increase within the initiatives studied, from 12% to 21%. The mitigation modalities observed with the aid of the projects, particularly inserting escalation clauses in contractual agreements, making changes requiring funding and increasing time limits, seem to be inadequate, as they do not provide a foundation for choices and remedy of disputes instead of mitigating the escalation of tasks starting from 3.21% to 12%. KEYWORDS: Escalation, Mitigation, Price, Construction projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
吉马大学建筑工程项目价格上涨及其缓解机制研究
施工中的费用上涨是指初步协议中项目的价格或企业的最低成本的上涨。累积生产任务费用必须是一个持续的程序,必须始终在所有项目中执行,因为价格上涨的原因因项目而异,也因施工部门而异。这一观察的动机是评估费用上涨、上涨因素和缓解机制,以决定施工举措。2020年2月1日至30日,对12名工人进行了问卷调查,并对7名关键信息员进行了访谈,以深入了解选定的四个吉马大学建设项目,即项目a至项目D。生成相对重要性指数值,并对影响费用上涨的因素进行排名,以了解其相对重要性。研究发现,在所研究的举措中,收费有适度的增加,从12%增加到21%。在项目的帮助下观察到的缓解模式,特别是在合同协议中插入升级条款,做出需要资金的更改和增加时间限制,似乎是不够的,因为它们没有为争议的选择和补救提供基础,而不是将任务的升级从3.21%降低到12%。关键词:升级、缓解、价格、建设项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.10
自引率
27.30%
发文量
0
期刊介绍: I am very pleased and honored to be appointed as an Editor-in-Chief of the Jordan Journal of Civil Engineering which enjoys an excellent reputation, both locally and internationally. Since development is the essence of life, I hope to continue developing this distinguished Journal, building on the effort of all the Editors-in-Chief and Editorial Board Members as well as Advisory Boards of the Journal since its establishment about a decade ago. I will do my best to focus on publishing high quality diverse articles and move forward in the indexing issue of the Journal.
期刊最新文献
Modeling of Risk Factors for Vulnerable Road Users’ Crashes on National Highways Passing through Medium-sized Indian Cities Investigating the Effects of Adhesive on the Shear Capacity of Bolted Steel Connections Spatiotemporal Analysis of Property Damage-only Accident Hotspots Using GIS in Sharjah, UAE Statistical Analysis of Operational Carbon for Different Building Types in the UAE Strategies for Enhancing Traffic Safety among Adolescent and Adult Motorcycle Riders in Indonesia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1