Penentuan Waktu Proses Pembuatan Kain Dengan Pendekatan Cross-Case pada Industri Tekstil

Organum Pub Date : 2018-06-01 DOI:10.35138/organum.v1i1.28
Eva Nugraha, Rini Mulyani Sari
{"title":"Penentuan Waktu Proses Pembuatan Kain Dengan Pendekatan Cross-Case pada Industri Tekstil","authors":"Eva Nugraha, Rini Mulyani Sari","doi":"10.35138/organum.v1i1.28","DOIUrl":null,"url":null,"abstract":"PT. X was a company engaged in weaving cotton production. Many types of cotton consisted of type 185, type 186, type 188 and type 189. Nevertheless, there were still many problems in the operational production of the weaving department. One of them was the length in processing time of the weaving section that could affect the next process. Based on a literature review, it showed that lean method could be implemented in process industry even it was not entirely. The method that usually used in the process industry was the cross-case method. A case study was a method that chosen in conducting this research by forming propositions first. There were two products selected as the case study: cotton 188 and cotton 189. This research consisted of two steps. The first step was the measurement of operational performance before implementing the lean method.  The second step was cross-case analysis by synchronizing between the empirical data and the propositions. The lean method would increase the accuracy of product delivery. It had been proven by reduction of the cycle time of both products ranges from 18,5% to 31,5%. The cross-case method could be applied with the Kanban, the set-up time reduction and forming the pull system in the production floor.PT. X adalah perusahaan yang memproduksi kain katun. Terdapat beberapa corak kain katun yang diproduksi, diantaranya kain katun tipe 185, tipe 186, tipe 188 dan tipe 189. Namun masih banyak kendala dalam bagian operasional produksi, khususnya bagian penenunan kain. Akibat yang ditimbulkan dapat terlihat dari lamanya waktu proses di bagian penenunan kain yang berpengaruh terhadap proses selanjutnya. Berdasarkan literature review yang dilakukan, didapatkan hasil bahwa lean dapat diimplementasikan pada industri tekstil, namun tidak sepenuhnya. Studi kasus adalah metode yang dipilih dalam melakukan penelitian ini. Untuk meneliti menggunakan metode studi kasus, maka harus dibangun proporsi terlebih dahulu sehingga arah penelitian menjadi jelas dan terarah.  Terdapat dua produk yang dipilih sebagai studi kasus yaitu katun 189 dan katun 188. Penelitian ini dilakukan dalam dua langkah. Langkah pertama berupa pengukuran performansi operasional situasi sebelum dan sesudah mengimplementasikan metode lean. Tahap terakhir adalah membandingkan antara data empiris dengan proposisi yang. Metode lean akan meningkatkan ketepatan pengiriman produk, yang dapat dibuktikan dengan penurunan cycle time untuk kedua studi kasus berkisar antara 18,5% hingga 31,5%. Metode cross-case diaplikasikan melalui pelaksanaan kanban dan set up time reduction, pembentukan pull system di lantai produksi.","PeriodicalId":33849,"journal":{"name":"Organum","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35138/organum.v1i1.28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

PT. X was a company engaged in weaving cotton production. Many types of cotton consisted of type 185, type 186, type 188 and type 189. Nevertheless, there were still many problems in the operational production of the weaving department. One of them was the length in processing time of the weaving section that could affect the next process. Based on a literature review, it showed that lean method could be implemented in process industry even it was not entirely. The method that usually used in the process industry was the cross-case method. A case study was a method that chosen in conducting this research by forming propositions first. There were two products selected as the case study: cotton 188 and cotton 189. This research consisted of two steps. The first step was the measurement of operational performance before implementing the lean method.  The second step was cross-case analysis by synchronizing between the empirical data and the propositions. The lean method would increase the accuracy of product delivery. It had been proven by reduction of the cycle time of both products ranges from 18,5% to 31,5%. The cross-case method could be applied with the Kanban, the set-up time reduction and forming the pull system in the production floor.PT. X adalah perusahaan yang memproduksi kain katun. Terdapat beberapa corak kain katun yang diproduksi, diantaranya kain katun tipe 185, tipe 186, tipe 188 dan tipe 189. Namun masih banyak kendala dalam bagian operasional produksi, khususnya bagian penenunan kain. Akibat yang ditimbulkan dapat terlihat dari lamanya waktu proses di bagian penenunan kain yang berpengaruh terhadap proses selanjutnya. Berdasarkan literature review yang dilakukan, didapatkan hasil bahwa lean dapat diimplementasikan pada industri tekstil, namun tidak sepenuhnya. Studi kasus adalah metode yang dipilih dalam melakukan penelitian ini. Untuk meneliti menggunakan metode studi kasus, maka harus dibangun proporsi terlebih dahulu sehingga arah penelitian menjadi jelas dan terarah.  Terdapat dua produk yang dipilih sebagai studi kasus yaitu katun 189 dan katun 188. Penelitian ini dilakukan dalam dua langkah. Langkah pertama berupa pengukuran performansi operasional situasi sebelum dan sesudah mengimplementasikan metode lean. Tahap terakhir adalah membandingkan antara data empiris dengan proposisi yang. Metode lean akan meningkatkan ketepatan pengiriman produk, yang dapat dibuktikan dengan penurunan cycle time untuk kedua studi kasus berkisar antara 18,5% hingga 31,5%. Metode cross-case diaplikasikan melalui pelaksanaan kanban dan set up time reduction, pembentukan pull system di lantai produksi.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
纺织工业时间过程制造的跨案例法确定
PT.X是一家从事纺织棉花生产的公司。许多类型的棉花包括185型、186型、188型和189型。尽管如此,织造部门的业务生产仍然存在许多问题。其中之一是织造段的加工时间长度,这可能会影响下一道工序。基于文献综述,表明精益方法可以在流程工业中实施,即使它不是完全的。流程工业中通常使用的方法是交叉案例法。案例研究是在进行这项研究时选择的一种方法,首先形成命题。有两种产品被选为案例研究:棉花188和棉花189。这项研究包括两个步骤。第一步是在实施精益方法之前测量运营绩效。第二步是通过同步经验数据和提案进行跨案例分析。精益方法将提高产品交付的准确性。通过将两种产品的循环时间从18.5%减少到31.5%,已经证明了这一点。交叉案例法可以应用于看板,减少设置时间,并在生产车间形成拉动系统。PT.X是一家棉布公司。生产了一些棉布,包括185型、186型、188型和189型的棉布。但在生产的操作部分,尤其是织物照明部分,仍然有很多控制。由此产生的效果可以从长时间的过程中看到影响下一个过程的布片照明。根据文献综述,发现精益可以在纺织行业实施,但不能完全实施。案例研究是选择进行这项研究的方法。为了使用案例研究方法进行研究,应该首先构建比例,以便研究的方向变得清晰和有方向性。有两种产品被选为案例研究,即棉花189和棉花188。这项研究分两步进行。第一步是在实施精益方法之前和之后测量情况的操作性能。最后一个阶段是将经验数据与该命题进行比较。精益方法将提高产品交付的准确性,这可以通过将两个案例研究的周期时间从18.5%减少到31.5%来证明。交叉案例法是通过画布的应用和设置时间的减少,在生产车间形成一个拉动系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
3
审稿时长
4 weeks
期刊最新文献
Customer Engagement: Eksplorasi Customer Relationship Management dan Media Sosial di UMKM Tekanan Fiskal dan Keberlanjutan Penganggaran Modal pada Sektor Pemerintah: Pendekatan Tinjauan Literatur Sistematis tematic Mapping Study Tourism Business With An Entrepreneurial Marketing Perspective Organizational Change & Restructuring: Analisis Bibliometrik & Literature Review pada Basis Data Scopus (1987–2021) Strategi Penilaian Prospek Saham Telekomunikasi dengan Indikator RSI dan Stochastic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1