Readiness and Challenges of the Construction Industry in Implementing Building Information Modelling (BIM)

IF 1.2 Q3 EDUCATION & EDUCATIONAL RESEARCH Journal of Technical Education and Training Pub Date : 2023-03-30 DOI:10.30880/jtet.2023.15.01.014
Miza Raimi Mohd Saf’a, T. T. Kiong, Nuraliah Abd Nasir
{"title":"Readiness and Challenges of the Construction Industry in Implementing Building Information Modelling (BIM)","authors":"Miza Raimi Mohd Saf’a, T. T. Kiong, Nuraliah Abd Nasir","doi":"10.30880/jtet.2023.15.01.014","DOIUrl":null,"url":null,"abstract":"Building Information Modelling (BIM) is one of the innovative approaches that has been developed and widely accepted in the construction industry. In Malaysia, BIM usage is still low and not many firms have taken full advantage of its potential despite theinvestment in BIM being proven to be well worth the cost of implementation to organizations. Therefore, this study has been conducted to identify the current status of BIM implementation in Malaysia. This study uses a qualitative approach with an explanatory research design to explore the phenomenon of BIM implementation in the construction industry. This study was aimed to identify the readiness and challenges in BIM implementation from twelve (12) participantsfrom consultants and contractors in Malaysiawho have already implemented and not have implemented BIM where the researcher used purposive sampling technique with snowballing sampling. In obtaining the data from participants, the researcher has conducted a semi-structured interview data collection technique. The data were then analyzedusing thematic analysis to identify patterns and themes among the research questions in two categories of participants. This study finds that the rate of BIM implementation in construction industry is very low and the most factors influence companies’ readiness in BIM implementation from both categories of participants are client, enforcement from authority and lack of project that needs BIM. This study also found that the most challenges faced in BIM implementation areBIM exposure, cost implementation and others. In addition to that, this study proposing effective strategies for enhancing the BIM implementation in Malaysia such as introducing of BIM in university curriculum, BIM enforcement from the authority and others.","PeriodicalId":43208,"journal":{"name":"Journal of Technical Education and Training","volume":" ","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Technical Education and Training","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/jtet.2023.15.01.014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"EDUCATION & EDUCATIONAL RESEARCH","Score":null,"Total":0}
引用次数: 0

Abstract

Building Information Modelling (BIM) is one of the innovative approaches that has been developed and widely accepted in the construction industry. In Malaysia, BIM usage is still low and not many firms have taken full advantage of its potential despite theinvestment in BIM being proven to be well worth the cost of implementation to organizations. Therefore, this study has been conducted to identify the current status of BIM implementation in Malaysia. This study uses a qualitative approach with an explanatory research design to explore the phenomenon of BIM implementation in the construction industry. This study was aimed to identify the readiness and challenges in BIM implementation from twelve (12) participantsfrom consultants and contractors in Malaysiawho have already implemented and not have implemented BIM where the researcher used purposive sampling technique with snowballing sampling. In obtaining the data from participants, the researcher has conducted a semi-structured interview data collection technique. The data were then analyzedusing thematic analysis to identify patterns and themes among the research questions in two categories of participants. This study finds that the rate of BIM implementation in construction industry is very low and the most factors influence companies’ readiness in BIM implementation from both categories of participants are client, enforcement from authority and lack of project that needs BIM. This study also found that the most challenges faced in BIM implementation areBIM exposure, cost implementation and others. In addition to that, this study proposing effective strategies for enhancing the BIM implementation in Malaysia such as introducing of BIM in university curriculum, BIM enforcement from the authority and others.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建造业在推行建筑资讯模型(BIM)方面的准备及挑战
建筑信息建模(BIM)是建筑行业中已经开发并广泛接受的创新方法之一。在马来西亚,BIM的使用率仍然很低,尽管对BIM的投资被证明对组织来说非常值得实施成本,但并没有多少公司充分利用其潜力。因此,本研究旨在确定马来西亚BIM实施的现状。本研究采用定性方法和解释性研究设计,探讨建筑业BIM实施的现象。本研究旨在确定马来西亚咨询公司和承包商的十二(12)名参与者在实施BIM方面的准备情况和挑战,他们已经实施和尚未实施BIM,研究人员使用了滚雪球式采样的有目的的采样技术。在获取参与者的数据时,研究人员采用了半结构化访谈数据收集技术。然后使用主题分析对数据进行分析,以确定两类参与者的研究问题的模式和主题。本研究发现,建筑行业的BIM实施率非常低,影响企业BIM实施准备程度的主要因素是客户、权威机构的强制执行和缺乏需要BIM的项目。该研究还发现,BIM实施面临的最大挑战是BIM暴露、成本实施和其他方面。除此之外,本研究还提出了加强马来西亚BIM实施的有效策略,如在大学课程中引入BIM、当局实施BIM等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Technical Education and Training
Journal of Technical Education and Training EDUCATION & EDUCATIONAL RESEARCH-
CiteScore
2.10
自引率
14.30%
发文量
12
期刊介绍: JTET will consider for publications original research articles, critical reviews as well as technical reports that can further our understanding of TVET issues and concerns
期刊最新文献
The Influence of Infrastructure in Agricultural Subjects' Practical Learning Environment on ASPer UPM Students' Interest and Field of Study Selection Managerial Entrepreneurial Competencies Framework for Technical College Programs: Concept and Relevance The Effect of Fire Training Given with Virtual Reality Applications on Individual Awareness Employability Skills and Career Development Self-Efficacy as Indicators for Workforce Success Localizing SDG in Eastern Region Malaysia: Key Challenges of Project Impact Evaluation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1