FACTORS INFLUENCING THE LATE DELIVERY OF PROJECTS IN STATE-OWNED ENTERPRISES: THE CASE OF ESKOM

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2021-12-01 DOI:10.7166/32-4-2455
Lubabalo Flepisi, C. Mlambo
{"title":"FACTORS INFLUENCING THE LATE DELIVERY OF PROJECTS IN STATE-OWNED ENTERPRISES: THE CASE OF ESKOM","authors":"Lubabalo Flepisi, C. Mlambo","doi":"10.7166/32-4-2455","DOIUrl":null,"url":null,"abstract":"Delays in project completion by state-owned enterprises are a major concern and a threat to the South African economy. This study investigates both the internal and the external factors influencing the late delivery of projects in state-owned enterprises, with ESKOM as a case study. The research design was a survey questionnaire that was used to gather sufficient information. The study revealed key internal and external factors influencing the late delivery of projects in the state-owned enterprises, including the failure to update construction programmes, the late delivery of contractor-supplied materials, corruption, and political interference. In conclusion, we posit that, to ensure early project completion, the authorisation and empowerment of the project team is vitally important.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":" ","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/32-4-2455","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Delays in project completion by state-owned enterprises are a major concern and a threat to the South African economy. This study investigates both the internal and the external factors influencing the late delivery of projects in state-owned enterprises, with ESKOM as a case study. The research design was a survey questionnaire that was used to gather sufficient information. The study revealed key internal and external factors influencing the late delivery of projects in the state-owned enterprises, including the failure to update construction programmes, the late delivery of contractor-supplied materials, corruption, and political interference. In conclusion, we posit that, to ensure early project completion, the authorisation and empowerment of the project team is vitally important.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
影响国有企业项目延迟交付的因素&以escom为例
国有企业延迟完成项目是一个主要问题,也是对南非经济的威胁。本研究以ESKOM为例,探讨了影响国有企业项目延迟交付的内部和外部因素。研究设计是一份调查问卷,用于收集足够的信息。该研究揭示了影响国有企业项目延迟交付的关键内部和外部因素,包括未能更新施工计划、承包商提供的材料延迟交付、腐败和政治干预。总之,我们认为,为了确保项目早日完成,项目团队的授权和授权至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1