Load optimization on the performance of combined cycle power plant Block 4 PT Indonesia Power Priok POMU

Louise Indah Utami, Ika Yuliyani, Yanti Suprianti, P. Iriani
{"title":"Load optimization on the performance of combined cycle power plant Block 4 PT Indonesia Power Priok POMU","authors":"Louise Indah Utami, Ika Yuliyani, Yanti Suprianti, P. Iriani","doi":"10.14203/j.mev.2022.v13.24-35","DOIUrl":null,"url":null,"abstract":"Combined cycle power plant (CCPP) is a closed-cycle power plant, where the heat from the gas turbine’s (GT) exhaust gas will be streamed to the heat recovery steam generator (HRSG) to be utilized by steam turbine (ST). CCPP Block 4 (Jawa-2) PT Indonesia Power Priok POMU has an installed capacity of 880 MW, consists of 2 GT units (301.5 MW each) and 1 ST unit (307.5 MW). The performance of a power plant depends on its load, as the efficiency of the turbine generator is low when operated at low loads. The data as of July 2019 showed that 2.2.1 (2 GT, 2 HRSG, 1 ST) configuration has been used in three conditions where the CC net load was around 30 - 45 %, which in fact could be compensated by the 1.1.1 (1 GT, 1 HRSG, 1 ST) configuration. This resulted in a decrease of the CC net efficiency up to 21.34 %. The optimization that can be done is to change the load configuration from 2.2.1 to 1.1.1 at 0 - 50 % of CC net load through simulations, by including the influence of the GT and HRSG start-up processes. The result of this optimization is that the CCPP performance increases due to higher performance of each turbine generator. Thus, the optimization results during July 2019 provided energy saving of 1,146.09 MMBTU or equivalent to cost saving of IDR 152,249,551.76.","PeriodicalId":30530,"journal":{"name":"Journal of Mechatronics Electrical Power and Vehicular Technology","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mechatronics Electrical Power and Vehicular Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14203/j.mev.2022.v13.24-35","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Combined cycle power plant (CCPP) is a closed-cycle power plant, where the heat from the gas turbine’s (GT) exhaust gas will be streamed to the heat recovery steam generator (HRSG) to be utilized by steam turbine (ST). CCPP Block 4 (Jawa-2) PT Indonesia Power Priok POMU has an installed capacity of 880 MW, consists of 2 GT units (301.5 MW each) and 1 ST unit (307.5 MW). The performance of a power plant depends on its load, as the efficiency of the turbine generator is low when operated at low loads. The data as of July 2019 showed that 2.2.1 (2 GT, 2 HRSG, 1 ST) configuration has been used in three conditions where the CC net load was around 30 - 45 %, which in fact could be compensated by the 1.1.1 (1 GT, 1 HRSG, 1 ST) configuration. This resulted in a decrease of the CC net efficiency up to 21.34 %. The optimization that can be done is to change the load configuration from 2.2.1 to 1.1.1 at 0 - 50 % of CC net load through simulations, by including the influence of the GT and HRSG start-up processes. The result of this optimization is that the CCPP performance increases due to higher performance of each turbine generator. Thus, the optimization results during July 2019 provided energy saving of 1,146.09 MMBTU or equivalent to cost saving of IDR 152,249,551.76.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
联合循环发电厂性能的负荷优化Block 4 PT Indonesia power Priok POMU
联合循环发电厂(CCPP)是一种闭式循环发电厂,来自燃气轮机(GT)废气的热量将流入热回收蒸汽发生器(HRSG),供蒸汽轮机(ST)使用。CCPP区块4(爪哇-2)PT Indonesia Power Priok POMU的装机容量为880 MW,由2台GT机组(每台301.5 MW)和1台ST机组(307.5 MW)组成。发电厂的性能取决于其负载,因为涡轮发电机在低负载下运行时效率较低。截至2019年7月的数据显示,2.2.1(2 GT,2 HRSG,1 ST)配置已在CC净负荷约为30-45%的三种情况下使用,事实上可以通过1.1.1(1 GT,1 HRSG,一ST)配置进行补偿。这导致CC净效率下降了21.34%。可以进行的优化是通过模拟将负荷配置从2.2.1更改为1.1.1,负荷为CC净负荷的0-50%,包括燃气轮机和HRSG启动过程的影响。这种优化的结果是,由于每个涡轮发电机的性能更高,CCPP性能提高。因此,2019年7月的优化结果提供了1146.09 MMBTU的节能,或相当于152249551.76印尼盾的成本节约。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
相关文献
Differential antigen specificity of hepatitis C virus-specific interleukin 17- and interferon γ-producing CD8(+) T cells during chronic infection.
IF 6.4 2区 医学Journal of Infectious DiseasesPub Date : 2012-04-01 DOI: 10.1093/infdis/jis018
Stefanie Grafmueller, Eva Billerbeck, Hubert E Blum, Christoph Neumann-Haefelin, Robert Thimme
Impaired effector function of HCV-specific CD8+ T cells in chronic hepatitis C virus infection
IF 25.7 1区 医学Journal of HepatologyPub Date : 2001-04-01 DOI: 10.1016/S0168-8278(01)80948-X
H. Wedemeyer, X-S. He, M. Nascimbeni, A.R. Davis, H.B. Greenberg, H. Alter, B. Rehermann
Antigen-specificity determines virus-specific CD8 T-cell exhaustion profile in chronic HBV infection
IF 0 Zeitschrift für GastroenterologiePub Date : 2018-01-01 DOI: 10.1055/s-0037-1612849
A. Schuch, K. Heim, D. Wieland, E. Salimi, C. Neumann-Haefelin, M. Hofmann, R. Thimme
来源期刊
CiteScore
0.70
自引率
0.00%
发文量
10
期刊最新文献
Five-axis parallel mechanism system (PMS) CNC partial link control system based on modified inverse kinematic of 6-DOF UPS parallel manipulator Impact of road load parameters on vehicle CO₂ emissions and fuel economy: A case study in Indonesia LSTM-based forecasting on electric vehicles battery swapping demand: Addressing infrastructure challenge in Indonesia Stability analysis of a hybrid DC-DC buck converter model using dissipation inequality and convex optimization Artificial intelligence in smart grids: A bibliometric analysis and scientific mapping study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1