Identifying the Critical Problems of Construction Contracting Management in Palestine

IF 1 Q4 ENGINEERING, CIVIL Jordan Journal of Civil Engineering Pub Date : 2016-01-01 DOI:10.14525/JJCE.10.1.3406
Nabil Dmaidi, I. Mahamid, Inas Shweiki
{"title":"Identifying the Critical Problems of Construction Contracting Management in Palestine","authors":"Nabil Dmaidi, I. Mahamid, Inas Shweiki","doi":"10.14525/JJCE.10.1.3406","DOIUrl":null,"url":null,"abstract":"The Palestinian construction sector is one of the key economic sectors and is the main force motivating the national economy. However, it is complex and affected by many constraints and obstacles that influence its outcomes. Therefore, this research was conducted with the aims to survey the construction contracting problems in Palestine from the different local contract stakeholders’ points of view; namely: contractors, owners, consultants and donor countries and institutions. 73 problems were collected and considered in this research and grouped in eleven main groups; namely, financial, political, administrative problems and problems related to the tender documents (contracts, drawings), specification and material adaptation (quality), contract parties themselves, sector environment, natural environment, arbitration and dispute solving, technology use and career ethics. A questionnaire was administered to evaluate the importance of the construction related problems. 310 questionnaires were distributed as follows: (183) contractors, (21) project owners, (92) project consultants and (14) donor countries and institutions. The results show that the highest ten important problems that Palestinian construction sector suffers from are as follows: rates’ burning due to intense competition between contractors, policy adoption of awarding the bid to the lowest price and not to the most accurate one, delaying owed payments by the owner, currency exchange changing value, owner deceleration in decision making, little size of projects in relation to the number of contractors, construction materials’ changing prices due to inflation, decline in the country’s economic situation, some contractors’ maneuvers by downloading some prices on other items and presence of conflicts between tender documents.","PeriodicalId":51814,"journal":{"name":"Jordan Journal of Civil Engineering","volume":"10 1","pages":"67-81"},"PeriodicalIF":1.0000,"publicationDate":"2016-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jordan Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14525/JJCE.10.1.3406","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

Abstract

The Palestinian construction sector is one of the key economic sectors and is the main force motivating the national economy. However, it is complex and affected by many constraints and obstacles that influence its outcomes. Therefore, this research was conducted with the aims to survey the construction contracting problems in Palestine from the different local contract stakeholders’ points of view; namely: contractors, owners, consultants and donor countries and institutions. 73 problems were collected and considered in this research and grouped in eleven main groups; namely, financial, political, administrative problems and problems related to the tender documents (contracts, drawings), specification and material adaptation (quality), contract parties themselves, sector environment, natural environment, arbitration and dispute solving, technology use and career ethics. A questionnaire was administered to evaluate the importance of the construction related problems. 310 questionnaires were distributed as follows: (183) contractors, (21) project owners, (92) project consultants and (14) donor countries and institutions. The results show that the highest ten important problems that Palestinian construction sector suffers from are as follows: rates’ burning due to intense competition between contractors, policy adoption of awarding the bid to the lowest price and not to the most accurate one, delaying owed payments by the owner, currency exchange changing value, owner deceleration in decision making, little size of projects in relation to the number of contractors, construction materials’ changing prices due to inflation, decline in the country’s economic situation, some contractors’ maneuvers by downloading some prices on other items and presence of conflicts between tender documents.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴勒斯坦工程承包管理的关键问题
巴勒斯坦建筑部门是关键的经济部门之一,是推动国民经济的主要力量。然而,它是复杂的,并受到影响其结果的许多制约和障碍的影响。因此,本研究旨在从不同的地方合同利益相关者的角度来调查巴勒斯坦的建筑承包问题;即:承包商、业主、顾问和捐助国和机构。本研究收集和考虑了73个问题,并分为11个主要组;即与招标文件(合同、图纸)、规范与材料适配(质量)、合同当事人自身、行业环境、自然环境、仲裁与争议解决、技术运用、职业道德等相关的财务、政治、行政问题和问题。采用问卷调查的方式评估建筑相关问题的重要性。310份调查表分发如下:(183)承包商,(21)项目业主,(92)项目顾问和(14)捐助国和机构。结果显示,巴勒斯坦建筑部门面临的十大最严重问题如下:承包商之间激烈竞争导致的价格燃烧,采取以最低价格而不是最准确的价格中标的政策,业主延迟付款,货币汇率变化,业主决策减速,工程规模与承包商数量相比较小,建筑材料价格因通货膨胀而变化,国家经济形势下滑,一些承包商通过下载其他项目的价格和投标文件之间存在冲突的方式进行操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.10
自引率
27.30%
发文量
0
期刊介绍: I am very pleased and honored to be appointed as an Editor-in-Chief of the Jordan Journal of Civil Engineering which enjoys an excellent reputation, both locally and internationally. Since development is the essence of life, I hope to continue developing this distinguished Journal, building on the effort of all the Editors-in-Chief and Editorial Board Members as well as Advisory Boards of the Journal since its establishment about a decade ago. I will do my best to focus on publishing high quality diverse articles and move forward in the indexing issue of the Journal.
期刊最新文献
Mapping Floods during Cloudy Weather Using Radar Satellite Images Assessing the Accident-Cost Relationship in Building Construction Projects Using Structural Equation Modeling Detection of Sub-surface Delamination and Moisture Penetration in Unlined Rock Tunnels Using Passive Thermography and Tapping Rehabilitation of Fire-damaged Reinforced-concrete Slabs Using Ferro-cement Using Palm Oil Fuel Ash as a Source Material for Alumina Silicate
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1