Structural integrity of precast concrete modular construction

IF 0.9 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY PCI Journal Pub Date : 2021-01-01 DOI:10.15554/PCIJ66.2-02
Jeff M. Wenke, C. Dolan
{"title":"Structural integrity of precast concrete modular construction","authors":"Jeff M. Wenke, C. Dolan","doi":"10.15554/PCIJ66.2-02","DOIUrl":null,"url":null,"abstract":"■ Recommended updates to design guidelines and connection details to preserve structural integrity in precast concrete modular construction are presented. The American Concrete Institute’s (ACI’s) Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19) contains structural integrity provisions for precast concrete panel buildings but does not address the structural integrity of precast concrete modules. ACI 318 requires spaced steel ties in all directions to tie the precast concrete panel elements together. These criteria are impractical for precast concrete modules due to the construction methods and the overall rigidity of each module. Precast concrete modules are inherently stable, even when subjected to General Services Administration (GSA) criteria for partial removal of structural walls or corners, which require that if a portion of a wall or an entire module is removed, the remaining portions must have sufficient capacity to carry the resulting gravity loads. This paper examines the stress increases due to partial wall removal and the possibility of total module removal. It discusses strength reserves, provides recommendations for future editions of ACI 318 and the PCI Design Handbook: Precast and Prestressed Concrete, and presents conceptual connections that provide the continuity and ductility needed to maintain structural integrity following total module removal.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"66 1","pages":"58-70"},"PeriodicalIF":0.9000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/PCIJ66.2-02","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 3

Abstract

■ Recommended updates to design guidelines and connection details to preserve structural integrity in precast concrete modular construction are presented. The American Concrete Institute’s (ACI’s) Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19) contains structural integrity provisions for precast concrete panel buildings but does not address the structural integrity of precast concrete modules. ACI 318 requires spaced steel ties in all directions to tie the precast concrete panel elements together. These criteria are impractical for precast concrete modules due to the construction methods and the overall rigidity of each module. Precast concrete modules are inherently stable, even when subjected to General Services Administration (GSA) criteria for partial removal of structural walls or corners, which require that if a portion of a wall or an entire module is removed, the remaining portions must have sufficient capacity to carry the resulting gravity loads. This paper examines the stress increases due to partial wall removal and the possibility of total module removal. It discusses strength reserves, provides recommendations for future editions of ACI 318 and the PCI Design Handbook: Precast and Prestressed Concrete, and presents conceptual connections that provide the continuity and ductility needed to maintain structural integrity following total module removal.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预制混凝土模块化结构的结构完整性
■建议更新设计指南和连接细节,以保持预制混凝土模块化结构的结构完整性。美国混凝土协会(ACI)的结构混凝土建筑规范要求(ACI 318-19)和注释(ACI 318R-19)包含预制混凝土板建筑的结构完整性规定,但没有解决预制混凝土模块的结构完整性问题。aci318要求在各个方向有间隔的钢箍将预制混凝土板单元绑在一起。由于施工方法和每个模块的整体刚度,这些标准对于预制混凝土模块是不切实际的。预制混凝土模块本质上是稳定的,即使受到总务管理局(GSA)部分拆除结构墙或角落的标准的约束,该标准要求,如果部分墙或整个模块被拆除,其余部分必须有足够的能力承受由此产生的重力载荷。本文考察了由于部分墙体拆除和全部模组拆除的可能性而引起的应力增加。它讨论了强度储备,为ACI 318和PCI设计手册:预制和预应力混凝土的未来版本提供了建议,并提出了概念连接,提供了在全部模块拆除后保持结构完整性所需的连续性和延展性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
期刊最新文献
Kgaria (Boletaceae, Boletoideae) gen. nov. in Australia: Neither a Tylopilus nor a Porphyrellus. Ultra-high-performance concrete research at PCI Experimental study on the use of compound alkaline materials to solidify lake sediments Axial load behavior of reinforced concrete columns with high-strength steel coiled strips as confinement Supply chain management for modular construction using building information modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1