{"title":"Design and cyclic testing of a gusset plate connection for precast concrete buckling-restrained braced frames","authors":"Hannah D. Kessler, K. Conway, L. Redmond, G. Pataky","doi":"10.15554/pcij68.2-03","DOIUrl":null,"url":null,"abstract":"A design method for precast concrete buckling-restrained braced frames with traditional gusset plate connections has not yet been codified. In addition, experimental data for this novel system are lacking. The primary objectives of this research were to design and experimentally test a partial system under representative seismic loads and to determine the applicability of the uniform force method (UFM) for connection interface force distribution. A quasi-static cyclic test was performed on a scaled, partial system. Experimental results showed that the UFM alone does not accurately predict interface forces for this system because the method does not account for frame action. Results also showed that there is some change in column base fixity as the frame undergoes larger horizontal displacements. This was the first U.S. laboratory test on a scaled, partial version of this system. Development of a codified design method would require further testing to determine an appropriate interface force distribution and quantify the change in column base fixity.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/pcij68.2-03","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 1

Abstract

A design method for precast concrete buckling-restrained braced frames with traditional gusset plate connections has not yet been codified. In addition, experimental data for this novel system are lacking. The primary objectives of this research were to design and experimentally test a partial system under representative seismic loads and to determine the applicability of the uniform force method (UFM) for connection interface force distribution. A quasi-static cyclic test was performed on a scaled, partial system. Experimental results showed that the UFM alone does not accurately predict interface forces for this system because the method does not account for frame action. Results also showed that there is some change in column base fixity as the frame undergoes larger horizontal displacements. This was the first U.S. laboratory test on a scaled, partial version of this system. Development of a codified design method would require further testing to determine an appropriate interface force distribution and quantify the change in column base fixity.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预制混凝土屈曲约束支撑框架扣板连接的设计与循环试验
传统扣板连接预制混凝土屈曲约束支撑框架的设计方法尚未形成规范。此外,这种新系统的实验数据缺乏。本研究的主要目的是设计和实验测试一个具有代表性的地震荷载作用下的局部系统,并确定均匀力法(UFM)在连接界面力分布方面的适用性。准静态循环试验进行了一个比例,部分系统。实验结果表明,由于该方法没有考虑框架的作用,因此单独使用UFM方法不能准确地预测系统的界面力。结果还表明,当框架承受较大的水平位移时,柱底固定点也有一定的变化。这是美国第一次对该系统的部分缩放版本进行实验室测试。制定规范的设计方法需要进一步的测试,以确定适当的界面力分布,并量化柱基固定点的变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
期刊最新文献
Kgaria (Boletaceae, Boletoideae) gen. nov. in Australia: Neither a Tylopilus nor a Porphyrellus. Ultra-high-performance concrete research at PCI Experimental study on the use of compound alkaline materials to solidify lake sediments Axial load behavior of reinforced concrete columns with high-strength steel coiled strips as confinement Supply chain management for modular construction using building information modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1