{"title":"Modeling maximum ramp-up and production rates of stoping mining","authors":"P. Vergara","doi":"10.19150/me.6587","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":91142,"journal":{"name":"Mining engineering","volume":"68 1","pages":"73-79"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19150/me.6587","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}