{"title":"Analysis of additional works in completed railway construction projects","authors":"A. Leśniak, F. Janowiec","doi":"10.22630/pniks.2019.28.3.34","DOIUrl":null,"url":null,"abstract":"The railway construction investments are characterized by a significant extension of individual phases and an increased number of entities participating in the construction investment process. Despite the use of many modern methods and techniques unforeseen phenomena and events which may occur during the execution of the investment cannot be excluded. All unexpected situations usually initiate consequences in the form of additional workload and costs not included by the contractor and longer duration of works. This fact is commonly referred to as the occurrence of the so-called additional works. The paper presents the results of research concerning additional works occurring during the realization of railway construction projects performed in southern Poland. The analysis was based on data which concerned projects completed in the period from 1 January 2012 to 31 December 2018.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-09-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/pniks.2019.28.3.34","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0
Abstract
The railway construction investments are characterized by a significant extension of individual phases and an increased number of entities participating in the construction investment process. Despite the use of many modern methods and techniques unforeseen phenomena and events which may occur during the execution of the investment cannot be excluded. All unexpected situations usually initiate consequences in the form of additional workload and costs not included by the contractor and longer duration of works. This fact is commonly referred to as the occurrence of the so-called additional works. The paper presents the results of research concerning additional works occurring during the realization of railway construction projects performed in southern Poland. The analysis was based on data which concerned projects completed in the period from 1 January 2012 to 31 December 2018.
期刊介绍:
Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.