Remoção de nitrogênio e fósforo do esgoto sanitário em um sistema de alagados construídos utilizando o capim vetiver

Q3 Environmental Science Revista Ambiente e Agua Pub Date : 2012-12-26 DOI:10.4136/AMBI-AGUA.925
Fernando Ernesto Ucker, R. A. Almeida, Pedro Daniel da Cunha Kemerich
{"title":"Remoção de nitrogênio e fósforo do esgoto sanitário em um sistema de alagados construídos utilizando o capim vetiver","authors":"Fernando Ernesto Ucker, R. A. Almeida, Pedro Daniel da Cunha Kemerich","doi":"10.4136/AMBI-AGUA.925","DOIUrl":null,"url":null,"abstract":"This study aimed to evaluate the Vetiver grass (Vetiveria zizanioides L. Nash) efficiency in removing nitrogen and phosphorus from the wastewater in a constructed wetlands treatment system. The experimental unit had twelve treatment modules, filled with layers of substrate. From the bottom to the surface, the following materials were placed: 0.15 m of gravel # 3; 0.10 m of gravel # 1; 0.20 m of washed sand and 0.05 m of gravel # 1. Inside the modules, the wastewater was maintained at 0.05 m or 0.25 m below the substrate surface, resulting in hydraulic retention times of 3.4 days and 1.9 days, respectively. The influent wastewater was captured in the entrance of a facultative pond, and it was applied to the surface of each treatment module, automatically, on a surface application rate of 51 L.m-2.d-1. The sewage percolated vertically in the system, in a sub-surface flow downward until it was captured in a drain pipe at the bottom of the module. The wastewater concentrations of total phosphorus and ammonium were analyzed before and after passing through the treatment modules. Evapotranspiration rates were measured and the efficiencies in removing the contaminant load were calculated. The results were submitted to F and Tukey tests, at 5% of probability. Treatment with the presence of the plant and sewage at 0.05 m from the surface had higher efficiency in the removal of nutrients reaching 90.5% of phosphorus removal and 93.9% for ammonia.","PeriodicalId":38374,"journal":{"name":"Revista Ambiente e Agua","volume":"7 1","pages":"87-98"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Ambiente e Agua","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4136/AMBI-AGUA.925","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 10

Abstract

This study aimed to evaluate the Vetiver grass (Vetiveria zizanioides L. Nash) efficiency in removing nitrogen and phosphorus from the wastewater in a constructed wetlands treatment system. The experimental unit had twelve treatment modules, filled with layers of substrate. From the bottom to the surface, the following materials were placed: 0.15 m of gravel # 3; 0.10 m of gravel # 1; 0.20 m of washed sand and 0.05 m of gravel # 1. Inside the modules, the wastewater was maintained at 0.05 m or 0.25 m below the substrate surface, resulting in hydraulic retention times of 3.4 days and 1.9 days, respectively. The influent wastewater was captured in the entrance of a facultative pond, and it was applied to the surface of each treatment module, automatically, on a surface application rate of 51 L.m-2.d-1. The sewage percolated vertically in the system, in a sub-surface flow downward until it was captured in a drain pipe at the bottom of the module. The wastewater concentrations of total phosphorus and ammonium were analyzed before and after passing through the treatment modules. Evapotranspiration rates were measured and the efficiencies in removing the contaminant load were calculated. The results were submitted to F and Tukey tests, at 5% of probability. Treatment with the presence of the plant and sewage at 0.05 m from the surface had higher efficiency in the removal of nutrients reaching 90.5% of phosphorus removal and 93.9% for ammonia.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在用香根草建造的湿地系统中,从污水中去除氮和磷
本研究旨在评价香根草(Vetiveria zizanioides L. Nash)在人工湿地处理系统中对废水中氮磷的去除效果。实验单元有12个处理模块,其中填充了衬底层。从底部到表面,放置以下材料:0.15 m的3号砾石;1号砾石0.10 m;水洗砂0.20 m, 1号砾石0.05 m。在模块内,废水保持在基质表面以下0.05 m或0.25 m处,水力滞留时间分别为3.4天和1.9天。进水废水被捕获在一个临时池塘的入口,并自动应用于每个处理模块的表面,表面施用量为51 l - m-2 - d-1。污水在系统中垂直渗透,在地下向下流动,直到它被捕获在模块底部的排水管中。分析了处理前后废水中总磷和总铵的浓度。测量了蒸散速率,并计算了去除污染物负荷的效率。结果以5%的概率提交给F和Tukey测试。在离地表0.05 m的地方进行植物和污水处理,对营养物的去除率更高,磷去除率达到90.5%,氨去除率达到93.9%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Revista Ambiente e Agua
Revista Ambiente e Agua Environmental Science-Environmental Science (all)
CiteScore
1.80
自引率
0.00%
发文量
48
审稿时长
22 weeks
期刊最新文献
Previsão probabilística de enchentes para uma pequena bacia hidrográfica do Pantanal Climatic zoning for eucalyptus cultivation through strategic decision analysis Sanitary quality of the rivers in the Communities of Manguinhos´ Territory, Rio de Janeiro, RJ Land use and its impacts on the water quality of the Cachoeirinha Invernada Watershed, Guarulhos (SP) Sustainable access to safe drinking water: fundamental human right in the international and national scene
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1