{"title":"A scientometrics survey on project scheduling","authors":"M. Ghaeli, S. Sadi-Nezhad","doi":"10.5267/J.JPM.2019.1.006","DOIUrl":null,"url":null,"abstract":"Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, \"decision support systems\" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.006","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.1.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0
Abstract
Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, "decision support systems" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.